BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2026 at 7:00 PM

Updated January 8, 2026

Site work and paving for a civil project in Chesterfield, New Hampshire. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

**As of December 1, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Town of Chester (Owner) is Requesting Bids From Pre-qualified Contractors (Bidder) for the Construction of the Following Project: Culvert/bridge Replacement Cole Road Chester, Nh (Gale Project No. 718730) The Owner Reserves the Right to Reject Any or All Bids, to Accept Any Bid, to Waive Any Informality on Bids Received, and to Omit Any Item or Items Deemed Advisable for the Best Interest of the Owner. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Project includes the following Work: Replacement of existing twin culverts with precast concrete box structure along Cole Road. Work shall include, but nor be limited to, installation of erosion control measures, removal/replacement of two (2) existing 48-inch High Density Polyethylene (HDPE) culverts with precast concrete box structure supported by cast in-place concrete footing on the existing roadway alignment, raising the existing roadway profile, installation of guard and bridge rails, placement of binder and wearing pavement courses, placement of shoulder leveling gravel material, placement of fertilizer and loam and seed. All questions about the meaning or intent of the Bidding Documents are to be submitted to Gale Associates, Inc. in writing by Monday, November 17, 2025 and the last addendum will be issues on Tuesday, November 18, 2025. Questions received less than four (4) calendar days prior to the date for opening Bids may not be answered.

Award

Bridges / Tunnels

$999,888.00

Public - City

Paving, Site Work

29

16

6

5

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
673
Active Projects
343
Bidding Soon
3,690
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2025

June 15, 2026

Project location map

Cole Rd, Chesterfield, NH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.