BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 28, 2025 at 7:00 PM

Updated November 29, 2025

Renovation of a mixed-use development in New York, New York. Completed plans call for the renovation of a medical facility.

Preparation of the subfloor to ensure proper adhesion and level surface. The factory authorized contractor will install Eco-Grip flooring in the new construction area to be used as room service meal delivery system cooking and meal assembly purposes. The dimensions of the room are approximately 1,740 square feet and 128 linear feet. To cover the dimensions of the room, it will require approximately 48 sheets of Eco-Grip flooring. The contractor must performed the flooring task in accordance with Eco- Grip flooring standard installation specifications, including minor floor preparation, installation of 6" integral base and color matched PVC base trim strips, Speed Flex welding, recessed floor drain detail, and Speed Flex floor sink collar detail unless clearly specified differently, as set forth within the Eco-Grip Flooring Specifications and installation guidelines, and Project Checklist. New Eco-Grip flooring (brand name or equal) will be installed in the kitchen area of the Brooklyn VA Medical Center to support the transition from a cook/chill retherm meal delivery system to a room service meal delivery system. The contractor will prepare the subfloor, install approximately 48 sheets of Eco-Grip flooring over an area of 1,740 square feet and 128 linear feet, and complete all associated tasks including installation of a 6" integral base, color-matched PVC base trim strips, Speed Flex welding, recessed floor drain detail, and Speed Flex floor sink collar detail. The flooring must meet Joint Commission and local safety requirements, and be durable, slip-resistant, hygienic, and easy to maintain. The contractor is responsible for providing all labor, materials, and equipment, performing the work safely and professionally, coordinating with VA facility management, and ensuring a clean work environment. Deliverables include fully installed flooring, documentation of materials and procedures, warranty information, and post-installation inspection and approval. The installation must be completed within four weeks of contract signing. Location: Brooklyn VA Medical Center, 800 Poly Place, Brooklyn, NY 11209

Post-Bid

Medical

$200,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
999
Active Projects
519
Bidding Soon
7,677
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2025

December 22, 2025

Project location map

800 Poly Pl, New York, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.