Published January 6, 2026 at 7:00 PM

Updated January 22, 2026

Site work for a transportation facility in Fort Worth, Texas. Completed plans call for site work for a transportation facility.

NT Moves Build Grant - TRE Double Tracking Construction Project - Civil Construction Trinity Metro invites interested contractors and vendors to attend a PreSolicitation Release Briefing for the upcoming TRE Double Tracking Construction Project - Civil Construction. This session will provide early insight into the scope, timeline, and procurement expectations ahead of the formal solicitation. Deadline for Submission of Written Questions (1) December 18, 2025 5:00 PM CST online portal. Contract Executed (4) March 2026 Trinity Metro Board Meeting to Recommend Contract Approval (3) February 2026 Trinity Metro (Authority) is soliciting proposals from qualified contractors to provide construction of the North Texas Mulitmoda Operations, Velocity, Efficiency, and Safety Program (NT MOVES) Grant - Trinity Railway Express (TRE) Double Tracking Construction Project in Tarrant County, Texas. The scope of work will consist of construction and related services as described in this Request for Proposals (RFP). The proposed TRE double tracking consists of 2.4-miles double tracking of the existing commuter rail system from approximately Handley Ederville Road (MP 618.53) to Precinct Line Road (MP 620.65) located within Tarrant County. This project will also include bridge rehabilitation and new bridge construction at 5 locations. All construction will occur adjacent to TRE active track within the existing TRE right-of-way. Construction will need to be phased so that all construction can be accomplished with no impacts to current TRE operations (Phasing plans have been shown in the plans). Construction duration is anticipated for 18 months. All Track work and signal/systems construction are excluded from this contract. Contractor is will need to coordinate with the Track and Signal contractors and will be responsible for placing of sub ballast and turnover to track contractor. 2. DESCRIPTION / SCOPE OF WORK FOR DOUBLE TRACK CONSTRUCTION Construction shall include but not limited to: 2.1 Demolition/Removals: a. Richland Hills Station Platform as shown on plans b. Railroad Bridges as shown on plans c. Track and Signal Demo/Removals - by others 2.2Civil Construction (a) SW3P and Site preparation (b) subgrade preparation, track bed construction, track grading up to and including sub ballast (c) ditch grading, track underdrains (d) bridge construction (e) retaining wall construction (f) concrete slope protection (g) storm drain, culvert & culvert extension installations (h) signage installs

Post-Bid

Transportation Terminals

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
418
Active Projects
218
Bidding Soon
3,729
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2026

February 13, 2026

Project location map

Multiple Locations, Fort Worth, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.