BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2025 at 8:00 PM

Updated October 29, 2025

Site work for a development in Ocala, Florida. Conceptual plans call for site work for a conservation development.

Professional engineering services will be required on a continuing basis for the District’s public improvements authorized by Chapter 190, Florida Statutes. The selected engineering firm will act as District Engineer and provide required District engineering services. Applicants must hold applicable federal, state and local licenses, be authorized to do business in Florida, and submit a Qualification Statement detailing qualifications, past experience, and supporting data using U.S. General Service Administrations Architect-Engineer Qualifications, Standard Form No. 330. Applicants must provide information on the ability and adequacy of personnel, certification as a minority business enterprise, willingness to meet time and budget requirements, past experience and performance (including experience as a District Engineer and with Marion County), geographic location of headquarters and offices, current and projected workloads, and volume of work previously awarded by the District. Applicants must also identify the individual who would handle District meetings, construction services, and other engineering tasks. Applicants interested must submit one hard copy and one electronic copy of Standard Form No. 330 and Qualification Statement by the specified time to the attention of George Flint at the District Managers Office. The Board will select and rank Applicants according to relevant statutory requirements and evaluation criteria on file, commencing contract negotiations with the highest ranked Applicant. If terms are not reached, negotiations proceed in order of rank. The District reserves the right to reject any and all Qualification Statements, and will not reimburse Applicants for expenses related to submission preparation. Protests regarding the terms of the notice or evaluation criteria must follow the outlined written protest procedure including required timelines and a protest bond.

Conceptual

Conservation and Development

Public - County

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
337
Active Projects
143
Bidding Soon
2,248
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2025

November 24, 2026

Project location map

To Be Determined, Ocala, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.