Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 28, 2025 at 8:00 PM
Updated October 30, 2025
Site work, paving and new construction of a road / highway in Tucson, Arizona. Conceptual plans call for the construction of a road / highway; for site work for a road / highway; and for paving for a road / highway.
The City of Tucson is seeking professional design, engineering, and public engagement services for a new bicycle and pedestrian bridge over Interstate 19 (I-19), connecting the planned Nebraska Street Bicycle Boulevard to the Spectrum Mall and to the Chuck Huckelberry Loop shared-use path system along the Santa Cruz River via an extension to the future Airport Wash Greenway. The consultant team will develop a design concept, prepare preliminary and final design plans, assist with public engagement, prepare relevant environmental clearance documents in accordance with ADOT/FHWA requirements and identify utility and agency coordination tasks. The design process will determine project elements including: bridge alignment, type and materials, expansion of existing path network, including new paved paths, fully accessible sidewalks and enhanced bicycle lanes, and native landscaping and public art. Design funding for this project is through the USDOT Reconnecting Communities Pilot Planning Grant. Background The City of Tucson wants to reconnect a community that has experienced historic disconnection from educational and medical opportunities, and the community's network of non-motorized trails and greenways. This project aims to support pre-construction tasks for the Airport Wash Greenway, while the major scope of the project is to construct a new bicycle and pedestrian bridge over I-19 from Nebraska Street. This new bike and pedestrian bridge will be a connector across I-19 to the Spectrum Mall and the Santa Cruz River alignment of the 137 miles worth of the Chuck Huckelberry Loop consisting of paved paths and bike lanes for non-motorized use. The new bicycle and pedestrian bridge over I-19 will be the second of its kind over an Interstate facility in the greater Tucson area after the Michigan St Pedestrian Bridge over I-19. This new bicycle and pedestrian bridge will also connect on the east side to the planned Nebraska St Bicycle Boulevard, a low-stress bicycle facility, funded through voter-approved Tucson Delivers: Strong Connections bond package connecting 4 parks and 3 schools. Urban greenways, such as the Chuck Huckleberry Loop and future Airport Wash Greenway, are corridors of protected open space in the heart of the city that are managed to promote active transportation and recreation as well as preserving and enhancing natural resources. The Airport Wash Greenway will be a 5-mile active transportation, recreation, and open space corridor stretching from The Loop at the Santa Cruz River to Tucson International Airport near Tucson Blvd. The design funding for this project was awarded in February 2023 via USDOT Reconnecting Communities Pilot Program. Question Submission Deadline: November 10, 2025, 3:30pm
Conceptual
Roads / Highways
$7,060,000.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 18, 2026
Nebraska Street BikePed Bridge & Airport Wash Greenway, Tucson, AZ
Related To This Project
Tucson, AZ
Bid Date: Oct 28 2025
Tucson, AZ
Bid Date: Nov 07 2025
Tucson, AZ
Bid Date: Nov 21 2025
Tucson, AZ
Bid Date: Oct 16 2025
Tucson, AZ
Bid Date: Dec 04 2025
Tucson, AZ
Bid Date: Nov 10 2025
Tucson, AZ
Bid Date: Nov 17 2025
Tucson, AZ
Bid Date: Nov 10 2025
Tucson, AZ
Bid Date: Nov 18 2025
Tucson, AZ
Bid Date: Sep 29 2025
Tucson, AZ
Bid Date: Jun 25 2025
Tucson, AZ
Bid Date: Oct 31 2025
Tucson, AZ
Bid Date: Oct 24 2025
Tucson, AZ
Bid Date: Oct 22 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
