Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 28, 2025 at 8:00 PM

Updated November 4, 2025

Demolition, site work and new construction of a water / sewer project in Cedar Grove, North Carolina. Conceptual plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

Orange County, North Carolina is releasing this Request for Qualifications (hereafter 'RFQ') seeking responses from qualified Providers to provide professional services to Orange County (hereafter 'County') for the Lake Orange Intake Tower Replacement Project, hereinafter referred to as "the Project". Geotechnical investigations are required to support the engineering design of the planned replacement of the existing intake tower. Written Questions Provider Wednesday - November 12, 2025 (3:00 PM) Direct all inquiries concerning this RFQ to: Jovana Amaro Finance Manager-Purchasing Phone: 919-245-2651 Email: finance-purchasing@orangecountync.gov The available budget for the scope of professional services as described in this RFQ (i.e., Geotechnical Investigations) is approximately $100,000. Construction costs for the intake tower replacement are expected to exceed $500,000. The Lake Orange Dam (hereafter "the Dam") is located at 1221 Lake Orange Road in Hillsborough, North Carolina. The Dam was constructed in the late 1960s via an earthen berm and concrete spillway/channel across the East Fork of the Eno River so as to create Lake Orange, a +/-150-acre surface water impoundment located within the Neuse River basin. The primary uses of Lake Orange are public water supply and maintenance of minimum dry weather flows in the East Fork of the Eno River. Limited recreational activities on Lake Orange are permitted as secondary uses. Lake Orange has a normal pool elevation of 615-ft (MSL) and has a drainage area of approximately 5,850 acres. The Dam structural height is approximately 40-feet with a normal pool freeboard of approximately 15-feet. The Dam crest length is approximately 1,100-feet and the Dam crest width is approximately 16-feet. The original construction of the Dam was funded via issuance of County bonds. The County is the current owner and operator of Lake Orange and the Dam. See Exhibit A for site location, driving directions and site photographs of existing conditions along the existing intake tower. Orange County reserves the right to reject any or all submittals, to waive minor informalities and to make such selection deemed in its best interest.

Conceptual

Water / Sewer

$500,000.00

Public - County

Demolition, New Construction, Site Work

3

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
268
Active Projects
108
Bidding Soon
1,977
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed