BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 13, 2025 at 7:00 PM

Updated November 14, 2025

Renovation of a water / sewer project in Austin, Texas. Completed plans call for the renovation of a one-story above grade water / sewer project.

The project generally consists of rehabilitation of up to 3 existing concrete and bolted steel storage tanks. Bidding requirements, bonds, insurance, and other project requirements are detailed in the Bid Documents. Bids must be accompanied by an acceptable bid security payable to the Owner in an amount equal to five percent (5%) of the total bid amount. If awarded the construction contract, the Contractor will be required to furnish performance and payment bonds. The tank level probe sensor is attached to a 4" threaded nipple that penetrates into the roof. Disassemble the probe wiring and replace the 4" nipple with new and weld in place. Surface prepare the interior of the tank where welding damages the coating and apply a 100% solids epoxy coating to restore protection to the steel substrate. Install a new roof hatch gasket per specified type and supplier. BID ITEMS: 1. Lump Sum to furnish all material, equipment, labor, superintendence and incidental work to replace 4" nipple by welding and re-connect the level probe. Prepare the adjacent surfaces on the interior and exterior by SSPC SP11 (MBX Bristle Blaster) and apply 18 mils of Tnemec Series 22 Epoxy. 2. Lump Sum to furnish all material, equipment, labor, superintendence and incidental work to replace the Roof Hatch Gasket. Provide a slip on gasket by McMaster-Carr and glue in place. 3. Unit Cost per Hour to furnish all material, equipment, labor, superintendence and incidental work for corrosion repairs by means deemed necessary by Engineer or Inspector. The rate is based on (20) man-hoursfor welding, grinding, epoxy surfacing with Tnemec Series 215, seam sealing w/Sika Flex 1a. material. COATING SPECIFICATION: Interior Surface Preparation Clean interior surface around weld repair per SSPC-SP11 Power Tool Cleaning to Bare Metal with Anchor profile shall be 1.5 minimum per ASTM D 4417, Method C or NACE Standard SP0287. Interior Coating System: Spot Repair Coat: Tnemec Series 22 Epoxoline applied at 16- to 18 dry mils. Thin only as instructed in manufacturers data sheets. Exterior Surface Preparation Clean exterior surface around new nipple and weld repair per SSPC-SP11 Power Tool Cleaning to Bare Metal with Anchor profile shall be 1.5 minimum per ASTM D 4417, Method C or NACE Standard SP0287. Apply a Exterior Coating System Spot Prime Coat: Tnemec Series 1 Omnithane applied at 2.5 to 3.5 dry mils. Thin only as instructed in manufacturers data sheets. Spot Finish Coat: Tnemec Series 1094 (color match existing) Endura-Shield applied at 3.0 to 5.0 dry mils. Thin only as instructed in manufacturers data sheets

Bid Results

Water / Sewer

$840,975.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
321
Active Projects
152
Bidding Soon
2,684
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 11, 2025

December 1, 2025

Project location map

3812 Eck Lane, Austin, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.