Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 21, 2025 at 7:00 PM
Updated November 22, 2025
Demolition and asbestos abatement for a playground / park / athletic field in Cheyenne, Wyoming. Completed plans call for the demolition of a playground / park / athletic field; and for asbestos abatement for a playground / park / athletic field.
As of November 21, 2025, this project has not yet been awarded. The project is expected to be awarded on December 8, 2025. High Plains Arboretum -Greenhouse and Lath House Demolition and Abatement (Headhouse Abatement NOT Included). Question Submission Deadline: November 3, 2025, 5:00pm Addendum Response Deadline: November 5, 2025, 5:00pm City Council 1st Reading: :November 24, 2025 Finance Committee: : December 2, 2025 City Council Final Approval : December 8, 2025 Contract Signature Processing: December 9, 2025 Completion: See Scope of Work - Separate Completion Dates. GREENHOUSE 1. GENERAL SCOPE OF WORK a. In general, the scope of work for the Greenhouse involves the abatement of asbestos containing materials (ACM) and removal of lead-based and leadcontaining paint on existing components of the existing historic greenhouses, lean-to greenhouses, connector spaces between the Head House and the Greenhouses and between the East and West Greenhouses, and associated cold frames. b. Note that there are existing n tunnels that run north-south through the connector between the Head House and the Greenhouses and East Greenhouse and the West Greenhouse as well as east-west below the slab in portions of the East Greenhouse and the West Greenhouse. 2. DEMOLITION AND ABATEMENT a. The following existing items shall be removed and disposed of as part of scope of the demolition and abatement contract: i. chicken wire hail protection - the galvanized steel pipe frame shall remain 1. after removing glazing and wood components, temporarily secure the frame mounts to the steel frame of the greenhouse ii. lead-based and lead-containing paint on the steel frame, other steel components, pipes, steel cap at top of concrete walls, rack & pinion sash operating hardware, etc. iii. wood components of the greenhouses, including the wooden glazing bars, muntins, sashes, etc. (glazing compound on glazing bars, etc. is asbestos containing and shall be removed with the glazing bars, etc.) iv. wood ledger, framing and plywood sheathing at the flat portion of roof at the southwest greenhouse where it butts to the west greenhouse. 1. to facilitate removal of the wood ledger, etc. as noted above, remove and salvage the short horizontal aluminum framing members and fasteners at the top of the frames and salvage for reinstallation by others 2. provide temporary bracing and support for the southwest greenhouse framing as required LATH HOUSE 1. GENERAL SCOPE OF WORK a. In general, the scope of work involves the removal of lead-based and leadcontaining paint on existing components of the existing historic Lath House. 2. DEMOLITION AND ABATEMENT a. The following existing items shall be removed and disposed of as part of scope of the demolition and abatement contract: i. Lead-based and lead-containing paint on the steel frame, etc. ii. Wood components including the wood lath at the walls and roof as well as associated trim, etc. i. Existing soil in the Lath House, shall be removed to the depth necessary to remove the lead contamination, 2 inches minimum. ii. Existing soil in an area 6 feet outside the perimeter of the Lath House, shall be removed to the depth necessary to remove the lead contamination.
Bid Results
Playgrounds / Parks / Athletic Fields
$148,175.00
Public - City
Asbestos Abatement, Demolition
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 12, 2025
April 15, 2026
Multiple Locations, Cheyenne, WY
Related To This Project
Cheyenne, WY
--
Cheyenne, WY
--
Cheyenne, WY
--
Cheyenne, WY
--
Cheyenne, WY
--
Cheyenne, WY
Bid Date: Nov 20 2025
Cheyenne, WY
--
Cheyenne, WY
Bid Date: Nov 13 2025
Cheyenne, WY
Bid Date: Dec 11 2025
Cheyenne, WY
--
Cheyenne, WY
--
Cheyenne, WY
--
Cheyenne, WY
--
Cheyenne, WY
Bid Date: Nov 12 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
