BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 30, 2025 at 8:00 PM

Updated October 31, 2025

Site work and outdoor lighting for a sidewalk / parking lot in Mount Vernon, Washington. Conceptual plans call for site work for a sidewalk / parking lot; and for outdoor lighting for a sidewalk / parking lot.

The City of Mount Vernon solicits interest from consulting firms with expertise in civil engineering, surveying, permitting,right-of-way acquisition,and related professional services. This negotiated-hourly rate agreement will extend from approximately January 2026 through December 2027 with the option for the City of Mount Vernon to extendit for additional time andmoney if necessary. The City of Mount Vernonreserves the right to amendterms of this "Request for Qualifications" (RFQ) tocirculate various addenda,or to withdraw the RFQat any time, regardless ofhow much time and effortconsultants have spent ontheir responses. The work to be performedby the selected consultant consists of preparing preliminary civil engineering designs, plans and specifications, permitting documentation and applications, right-of-way/real estate services, and construction managementand inspection services documentation to supportthe addition of trail lighting pedestrian improvementsto the Kulshan Trail in Mount Vernon, Washington. The Kulshan Trail isa shared-use, east-west trail extending from 4th Street to Waugh Road.The Kulshan Trail Lighting- 3 project extends alongthe trail segment from theintersection with NorthLaventure Road east tothe intersection with North30th Street. The proposed improvements include pedestrian-style lighting, underground power, and security camera amenities. Major features and services anticipated for theproject scope will include: * Trail lighting including allconduit and electrical design requirements * Security camera amenities integral with pedestrian lighting fixtures * ADA compliant sidewalkand pedestrian crossingimprovements (where required) * Environmental documentation and preparation ofpermit applications for National Environmental Policy Act (NEPA) review andapplicable local permittingrequirements. * Real estate servicessupporting acquisition ofprivate property temporary construction accessin accordance with federal standards and requirements * Construction management and inspection documentation. This project is fundedthrough a transportationfederal aid grant and hasa Disadvantaged BusinessEnterprise (DBE) goal of 0%. All preliminary engineering design activities arescheduled to be completed during 2026, includingobligation of awarded federal transportation construction funding. Construction is scheduled for2027. The method of Contractor Selection has not been Determined at this time.

Conceptual

Sidewalks / Parking Lot

$300,000.00

Public - City

Outdoor Lighting, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
3
Bidding Soon
1,915
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2026

Project location map

Kulshan Trail, Mount Vernon, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.