BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 3, 2025 at 7:00 PM

Updated November 4, 2025

Site work for a water / sewer project in San Antonio, Texas. Working plans call for site work for a water / sewer project.

Site 1 - Nottingham Dr and Tophill Rd from Bartell Dr to Greenwich Blvd. About the Project This package has four site locations. Project site one will install approximately 881 feet of 8-inch HDPE water mains by pipebursting, and 10 feet by open trench construction methods. Project site one includes an alley between Nottingham Dr and Tophill Rd from Bartell Dr to Greenwich Blvd. Water Main Replacement Project 5, which was approved in 2025, is part of ongoing efforts to replace deteriorating water mains that have a history of failures. Site 2 - Northridge Dr and Larkwood Dr from Crandall Pl to Kenilworth Blvd. About the Project This package has four site locations. Project site two will install approximately 580 feet of 8-inch HDPE water mains by pipebursting, and 186 feet by open trench construction methods. Project site two includes an alley between Northridge Dr and Larkwood Dr from Crandall Pl to Kenilworth Blvd. Water Main Replacement Project 5, which was approved in 2025, is part of ongoing efforts to replace deteriorating water mains that have a history of failures. Site 3 - Shadylane from E Terra Alta to Forest Glen About the Project This package has four site locations. Project site three will install approximately 997 feet of 8-inch HDPE water mains by open trench construction methods. Project site three includes Shadylane from E Terra Alta to Forest Glen. Water Main Replacement Project 5, which was approved in 2025, is part of ongoing efforts to replace deteriorating water mains that have a history of failures. Site 4 - Larchmont Dr and Irvington Dr from Greenwich Blvd to Kenilworth Blvd About the Project This package has four site locations. Project site three will install approximately 951 feet of 8-inch HDPE water mains by pipebursting methods. Project site four includes an alley between Larchmont Dr and Irvington Dr from Greenwich Blvd to Kenilworth Blvd. Water Main Replacement Project 5, which was approved in 2025, is part of ongoing efforts to replace deteriorating water mains that have a history of failures. Pre-Bid Details Notes: Details about the Pre-Bid meeting can be accessed on the SAWS solicitation website

Final Planning

Water / Sewer

$1,900,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
96
Bidding Soon
2,261
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2026

Project location map

To Be Determined, San Antonio, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.