Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 21, 2025 at 7:00 PM
Updated December 5, 2025
Asbestos abatement and renovation of a mixed-use development in Arvada, Colorado. Completed plans call for the renovation of a swimming pool.
Reference Number 0000402978 The Apex Park and Recreation District is issuing this Solicitation for the purpose of: Removing and replacing the pool's heating / boiler unit to the exterior pool at it's Secrest Rec. Center facility located at 6820 W. 64th. Ave Arvada, CO. 80003. o New boiler must fit on existing location. Current stand is 72" long x 36" wide x 51 1/2 " Tall. Contractor to verify dimensions in filed. o Remove & Dispose of existing boiler from site. New boiler installation includes: o Remove & replace existing electrical EPO switches and Defender Controls to boiler. Verify operational. o Remove flue and replace with new up to vertical roof penetration pipe. Inspect roof penetration pipe and replace with new if necessary. o Remove existing gas & water piping as far back as needed. Replace with new to match existing and verify connections don't leak. o Boiler Controls must be self-contained and not connected to BAS. o Increase boiler BTUH to maintain 86 Degrees outdoor summer pool temp. o New boiler must have bypass to maintain inlet temp as specified by manufacturer. o Perform combustion analysis on new boiler. o Perform factory start up on new boiler and provide documentation. o All work must meet code requirements. o CONTRACTORS RESPONSIBLE FOR ALL NECESSARY PERMITS. o Pipe valve relief to 2" above finished floor. o Provide owner training. o 2 yr parts & labor warranty. o Remove and replace makeup air to new boiler. o Remove all construction debris and any damage to existing room or equipment must be replaced with like or better. Question Deadline 11/13/2025 at 4:00 PM MT Questions are submitted online No, Questions and responses will be posted on online. Submit questions to: Darren Bjorlin, Manager of Capital Projects, DarrenB@ApexPRD.org Direct contact with the requesting department may result in vendor disqualification. Projected Start Date: Spring 2026 with an operational date of May 8th Buyer Preferences, Guidelines & Requirements General Requirements - Contractors License Required - Installation Required - Insurance Required - Training Required - Warranty Information Required Bonding Requirements - Bid Bond 3 % - Performance Bond 100 % - Retainage 5 % District reserves the right to reject any or all Proposals, to waive informalities or irregularities in the Proposals received, to reject non-conforming, non-responsive or conditional Proposals and to accept the Proposal which, in District's judgment, is in its best interest.
Post-Bid
Swimming Pools
$60,000.00
Public - City
Asbestos Abatement, Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 4, 2025
January 5, 2026
6820 W 66th Ave, Arvada, CO
Related To This Project
Arvada, CO
Bid Date: Nov 25 2025
Arvada, CO
--
Arvada, CO
Bid Date: Nov 19 2025
Arvada, CO
Bid Date: Dec 18 2025
Arvada, CO
Bid Date: Dec 15 2025
Arvada, CO
Bid Date: Jan 13 2026
Arvada, CO
Bid Date: Oct 28 2025
Arvada, CO
--
Arvada, CO
Bid Date: Nov 13 2025
Arvada, CO
Bid Date: Nov 05 2025
Arvada, CO
Bid Date: Nov 05 2025
Arvada, CO
Bid Date: Oct 30 2025
Arvada, CO
Bid Date: Oct 21 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
