BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 12, 2025 at 7:00 PM

Updated December 13, 2025

Site work for a bridge / tunnel in Kenosha, Wisconsin. Completed plans call for site work for a bridge / tunnel.

Bids shall be accompanied by Bid Security in the form of a Bid Bond, certified check, or cashier's check made payable to the Owner in an amount of 5 percent of the Bidder's maximum Bid price Owner reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time or changes in the Work and the right to disregard all nonconforming, non-responsive, unbalanced or conditional Bids and the right to accept the Bid or Bids BASE BID Item No. 1. Remove & Replace 63" x 98" RCP Culvert 105 (CTH Z) 2. Trench Stabilization Mat 3. Re-Install and Maintain Traffic Control 4. Silt Fence 5. Removing Concrete Pavement 6. Excavation Common 7. Excavation Below Subgrade (Undistributed) 8. Geotextile Fabric Type SAS (Undistributed) 9. Breaker Run (Undistributed) 10. 1 1/4 " Crushed Aggregate Base 11. HMA Pavement (3 LT 58-28 S) 12. HMA Pavement (4 LT 58-28 S) 13. Bituminous Tack Coat 14. Crushed Aggregate Shoulder 15. Marking Line Epoxy 4-Inch 16. 4" Topsoil, Seed, Fertilizer, & Erosion Mat ' ALTERNATE A Item No. 17. Remove & Replace 58" x 91" RCP Culvert 453 (CTH A) 18. Trench Stabilization Mat ALTERNATE B Item No. 19. Remove & Replace 60" RCP Culvert 885 (CTH X) 20. Remove & Replace 60" RCP Culvert 885.1 (CTH X) 21. Trench Stabilization Mat 22. Interim Roadside Hazard Protection and Traffic Control 23. Silt Fence 24. Temporary Ditch Checks 25. Excavation Common 26. MGS Guardrail 3 27. MGS Guardrail Short Radius 28. MGS Guardrail Terminal EAT 29. MGS Guardrail Short Radius Terminal 30. 4" Topsoil, Seed, Fertilizer, & Erosion Mat All bidders must file a "Bidders Proof of Responsibility Form" with the Kenosha County Highway Commissioner on or before 3:00 p.m. on November 6, 2025 (Form PA-10) All "Bidders Proof of Responsibility Form" shall be emailed to the County Highway Commissioner at Gregory.Boldt@kenoshacountywi.gov. a. Kenosha County anticipates awarding this Contract on or after November 17, 2025. b. Kenosha County anticipates issuing a formal notice to proceed on December 15, 2025. c. Upon receipt of written Notice to Proceed the Contractor shall complete all utility work (excavation, culvert removal and replacement, backfilling, initial turf restoration & stabilization, and pavement restoration) by February 28, 2026 and all remaining contract work by June 5, 2026. For Q/A contact ROBERT J. WIELGOS, P.E. PROJECT MANAGER - E-mail: robert.wielgos@rasmith.com OFFICE PHONE: 262-901-2216

Award

Bridges / Tunnels

$452,732.00

Public - County

Site Work

43

18

30

6

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
686
Active Projects
371
Bidding Soon
3,750
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2025

December 3, 2025

Project location map

Multiple Locations, Kenosha, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.