Published December 8, 2025 at 7:00 PM

Updated December 9, 2025

Site work for a water / sewer project in Braddock, Pennsylvania. Completed plans call for site work for a water / sewer project.

The project involves demolition and removal of the existing hydraulic system and related components, followed by installation of a new hydraulic system with supporting controls and buildings. Components to be removed include motors, pumps, reservoir, filters, filter housings, piping and pipe hangers, hydraulic fluid, valves, and manifolds. Any hydraulic piping embedded in concrete shall be drained, cut flush with the concrete surface, capped or plugged, and abandoned in place. Existing hydraulic cylinders will remain. Electrical demolition includes removal of specified buckets, cabinet doors, junction boxes, levers, buttons, indicators, limit switches, wiring, and hardware. Limited concrete demolition will be required for placement of new buildings and routing of new electrical cable and mechanical pipe. The work must be completed within 730 calendar days after written Notice to Proceed. Magnitude of Construction is between $10,000,000.00 and $25,000,000.00. The contractor shall begin performance within 10 calendar days and complete it within 730 calendar days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The ability to enter technical inquiries and questions relating to submission procedures or bonds will be disabled on 29 December 2025 at 5:00 P.M. E.T. Technical Inquiries/Questions and questions relating to Submission Procedures or Bonds are to be submitted online The Braddock hydraulic system upgrade consists of demolition and removal of the existing hydraulic system and its related components, and installation of a new hydraulic system with supporting controls and buildings. Primary hydraulic system components to be demolished and removed are motors, pumps, reservoir, filters, filter housings, piping & pipe hangers, hydraulic fluid, valves, and manifolds. Any hydraulic piping that is embedded in concrete shall be drained, cut flush with the concrete surface, capped or plugged, and abandoned in place. Only the hydraulic cylinders shall remain from the existing hydraulic system. Electrical demolition work shall include but not be limited to removal of specified buckets, cabinet doors, junction boxes, levers, buttons, indicators, limit switches, wiring, and hardware. Some concrete demolition work shall be required for placement of new buildings and routing of new electrical cable and mechanical pipe. The following paragraph outlines the new equipment that shall be furnished and installed by the contractor to support operation of the existing hydraulic cylinders. Four new hydraulic power units (HPUs) shall be furnished and installed on the lock walls inside three new 2-story HPU buildings at locations specified on the contract drawings. The HPU buildings shall be designed and constructed by the contractor in accordance with a performance specification and match the concept drawings included in the contract drawings. The HPUs shall send hydraulic power to the existing hydraulic cylinders by means of new stainless steel piping and new manifold mounted hydraulic components. The new hydraulic equipment shall be operated by new electronic controls that will be installed inside new panels and new control consoles. The new control panels shall be installed on each HPU with an additional control panel inside of the middle wall operations building. The new control consoles shall be installed inside four new 1-story control shelters at locations specified on the contract drawings. The control shelters shall be designed and constructed by the contractor in accordance with a performance specification and the concept drawings included in the contract drawings. New buckets and supporting equipment shall be installed inside existing motor control centers (MCCs). New hardware and power & control cabling shall be installed as specified and as required for operation of the new electrical/mechanical equipment. Some concrete installation work shall be required for placement of new buildings and routing of new electrical cable and mechanical pipe. Minimal new aluminum closed-type planking shall be required for placement over top new concrete utility trenches.

GC Bidding

Water / Sewer

$25,000,000.00

Public - Federal

Site Work

283

18

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
114
Bidding Soon
1,624
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2026

March 9, 2026

Project location map

To Be Determined, Braddock, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.