BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 12, 2025 at 7:00 PM

Updated December 13, 2025

Site work for a water / sewer project in San Andreas, California. Completed plans call for site work for a water / sewer project.

**As of December 12, 2025 , this project has not yet been awarded. The project is expected to be awarded on January 2026.** The Sawmill tank is located near the community of Arnold on a mountaintop at an approximate elevation of 4,500 feet above mean sea level. Access to the site is via Tank Road, a one-lane unpaved road that is steep with many tight turns. The road is not plowed and is inaccessible except by snow machine in the winter. The District desires to have the two replacement tanks constructed during the spring through fall seasons. The existing welded steel tank has a capacity of 3 million gallons but will be replaced by two 0.5- million-gallon bolted glass-lined steel tanks. The existing tank suffers from water quality issues due to being oversized and has reached the end of its useful life. Once the new tanks are constructed and commissioned, the existing tank and existing tank gravel pad will be decommissioned and are to be removed from the site. The project includes significant site grading and piping. Figure 1 identifies the project location. The Wallace tank is located near the community of Wallace, south of Camanche Reservoir. The site is generally flat within the proximity of the tank and is easily accessed via an unpaved access drive from Wallace Lake Drive. The existing welded steel tank is 0.22 million gallons and will be replaced by a single 0.23-million gallon glass-lined bolted steel tank. This project will require installation of three (3) 8,000- gallon temporary tanks and temporary above-ground piping. The existing tank and concrete foundation are to be removed from the site once the temporary tanks have been installed and commissioned. The new replacement tank and concrete foundation will be constructed in the same location as the existing tank. Once the permanent tank is commissioned, the temporary tanks and piping will be decommissioned and removed from the site. The project requires only minor grading, and permanent site piping is minimal. Figure 1 identifies the project location. These two tank replacement projects have individual CIP project numbers, but will have a combined bid schedule and must be bid, invoiced, and tracked together. Both sites are each less than one (1) acre and are greater than 1/4 mile apart. Therefore, a formal SWPPP is not required for these projects, but a construction BMP plan is provided in the plan set. Both projects are CEQA-Exempt. A non-mandatory pre-bid meeting will be held on October 23, 2025 at 10:00 AM starting at the Wallace SCOPE OF WORK A. The Work to be performed under this Contract shall consist of furnishing all equipment, materials, supplies, and manufactured articles, and furnishing all shipping and transportation and services, and performing all work or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. The Work shall be complete and all work, materials, and services not expressly indicated or called for in the Contract Documents which may be necessary for the complete and proper operation of the Project shall be provided by the CONTRACTOR as though originally so indicated at no increase in cost to the OWNER. B. Work includes all appurtenant work for the complete installation of the facilities as shown on the Drawings and these Project Specifications. In case of conflict, these Project Specifications shall take precedence. C. The CONTRACTOR is advised to inspect the site to observe actual working conditions. 1.03 PROJECT DESCRIPTION A. The project consists of grading, site work, underground piping and electrical, and installation of glass-lined bolted steel water storage tanks at two (2) locations within Calaveras County as identified in Section 1.01 of this Specification. The Sawmill site will require two (2) 500,000-gallon tanks, while the Wallace site will require one (1) 230,000-gallon tank. The Work is more particularly described in the Plans entitled iSawmill & Wallace Tank Replacement Project. The Work is comprised of two (2) different locations within the County: 1. Sawmill, northeast of White Pines Lake, approximate coordinates: Lat. 3816i20.72iN, Long. 12019i47.43iW 2. Wallace, south of the Camanche Reservoir, approximate coordinates: Lat. 3812i01.99iN, Long. 12057i49.48iW Contractor questions shall be submitted no later than November 20, 2025.

Bid Results

Water / Sewer

$5,639,544.00

Public - County

Site Work

61

26

2

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
294
Active Projects
105
Bidding Soon
1,848
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2025

April 1, 2026

Project location map

Multiple Locations, San Andreas, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.