Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 26, 2025 at 7:00 PM
Updated November 27, 2025
Renovation of a municipal facility in Ottawa, Ontario. Completed plans call for the renovation of a municipal facility.
Scope of Work 1. Work of this Contract comprises general construction and replacement of the existing fire pump, jockey pump and controllers, located at 284 Wellington St. Ottawa ON. 2. Remove and dispose of existing fire pump and associated fire protection piping as shown on plan. Disconnect power back to electrical panel and control wiring back to control panel. 3. Remove and dispose of existing jockey pump and associated fire protection piping as shown on plan. Disconnect power back to electrical panel and control wiring back to control panel. 4. Remove existing fire pump and jockey pump controller along with the automatic transfer switch (ATS). Disconnect power from pumps and electrical panel and remove existing as required. 5. Revise existing fire protection piping as shown on plan drawings, provide new valves, sensors, gauges and fittings as required. 6. Provide new packaged fire pump, jockey pump, automatic transfer switch (ATS) and controllers system in place of existing pumps. Extend emergency and normal power from existing electrical panel to new packaged unit controllers. Provide a structural unistrut to install new electrical conduit from electric panel to controller. 7. Retain existing incoming combined fire and domestic water piping complete with associated backflow preventer devices. 8. Demolish existing equipment and related controls and accessories as indicated on drawings. 9. Provide proper piping identification system. Submit samples to engineer for review. 10. Contractor shall carry base building control contractor (Carmichael) for all control requirement and upgrades to avoid any warranty on existing building automation system (BAS). 11. Clean and flush existing and new piping system before putting the system back into service. Provide cleaning to report for review. 12. It is the Contractors responsibility to provide all labour, material, equipment and supervision to complete the repairs outlined in this specification taking into account all site conditions, noise restriction, work area restrictions, protection requirements, accessibility restrictions, etc. No extras will be entertained for inconveniences after the award of this Contract. 13. Final cleaning of structure, fixtures, piping etc., and the disposal of all waste products and /or debris generated by the construction activity as well as any material present in the work area before the commencement of the work. The areas requiring cleaning shall consist of all areas affected by Work. 14. Update existing single line diagram to reflect new installations. 15. Upon award of tender general contractor to submit cost breakdown and schedule for work to be performed. 16. Conduct pre-installation meeting to verify project requirements, manufacturer's installation instructions, manufacturer's warranty and O&M manual requirements. 17. Conduct Integrated System Testing of all new equipment installed as per the CAN/ULC S1001-11 Integrated System Testing of Fire Protection and Life Safety Systems and Fire Protection. 18. Prior to commencement of work submit work plan, detailing sequence of work, and schedule for approval by consultant/client Representative. 19. Work covered by the contract documents includes Commissioning of the facility as per Section 01 91 13.13 – Commissioning (Cx) Requirements including engagement of third party structural engineer for verification of equipment structural support. 20. All removed equipment controllers, panels with CMMS number are required to be documented on specifics forms to be decommissioned, contractor to is to coordinate with facility to obtain necessary forms. The same is also true for all new equipment to be installed. Contractor is to complete all necessary CMMS form for demolition and new installation. 21. The East Memorial Building is a Classified Federal Heritage Building. Care must be taken to ensure that the heritage finishes/character-defining elements are not damaged during the scope of work. Contractor must take into consideration the building's character-defining elements identified in the Heritage Character Statement. Any damage to character-defining elements during work is to be documented and reported to BGIS Representative and BGIS Heritage Conservation Program. Advise BGIS Project Manager of any changes during the work. Changes during construction at a federal heritage building due to unforeseen impact on a character-defining element will require input from the BGIS Heritage Conservation Program. 22. Contractor is to put the fire alarm system on by-pass and have Fire Watch while system is down. Contractor is to provide a sample Fire Watch checklist for consultant’s review before commencing work. Official bid documents must be obtained from www.bgis.merx.com and bid submissions must be done through the Merx platform. Question Acceptance Deadline Nov 14, 2025 02:00 PM EST Award is subject to final approval
Award
Municipal
$168,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 20, 2025
January 5, 2026
284 Wellington St, Ottawa, ON
Related To This Project
Ottawa, ON
Bid Date: Nov 13 2025
Ottawa, ON
Bid Date: Nov 17 2025
Ottawa, ON
Bid Date: Nov 25 2025
Ottawa, ON
Bid Date: Nov 21 2025
Ottawa, ON
Bid Date: Dec 04 2025
Ottawa, ON
Bid Date: Dec 03 2025
Ottawa, ON
Bid Date: Nov 18 2025
Ottawa, ON
--
Ottawa, ON
Bid Date: Nov 27 2025
Ottawa, ON
Bid Date: Nov 19 2025
Ottawa, ON
Bid Date: Nov 12 2025
Ottawa, ON
--
Ottawa, ON
Bid Date: Nov 20 2025
Ottawa, ON
Bid Date: Nov 11 2025
Ottawa, ON
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
