BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 18, 2025 at 7:00 PM

Updated November 19, 2025

Site work for a playground / park / athletic field in Grayslake, Illinois. Completed plans call for site work for a one-story above grade playground / park / athletic field.

The work consists of re-shaping the existing shoreline and installing rip rap and boulders along the shoreline of Willow Point Park for erosion control according to permitting requirements of the US Army Corps of Engineers and Lake County, IL. Bidders are required to submit sealed bids using the Park District-provided bid form. All bidders must acknowledge receipt of the bid package by sending an electronic confirmation to the Executive Director. Only those who comply with this requirement will receive addenda and other communications regarding the project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 11/12/2025 at 2:00 PM CT Questions submitted via email to Brandon Magnini, Executive Director at bmagnini@wildwoodparkdistrict.com The project includes: -Reshaping of eroded shoreline back into existing shoreline to create stable base for geotextile fabric installation. - Installation of approximately 575 linear feet granite boulders and rip rap over eroded shoreline. - Site grading, base preparation, and restoration of disturbed areas. -Installation and management ofturbidity curtain in designated location per the project map to control spread ofsediment during construction. Main Scope ofWork includes the - Reshaping of eroded shoreline back into the existing shoreline to create a stable base for geotextile fabric installation. No spoils or earth to be removed offsite. -Installation of4oz woven geotextile fabric throughout scope of affected shoreline. - Installation and placement 65 tons of24"-36" OR 18"-24" Wisconsin granite boulders over geotextile fabric along 275' linear feet ofthe eroded lake-facing shoreline as indicated on the design plans. (PLEASE PRICE OUT BOTH OPTIONS AS SEPARATE LINE-ITEMS). -Installation and placement of45 tons of 6"-l 2" 4RR Rip Rap stone over geotextile fabric along 300' linear feet inside the inner cove shoreline as indicated on the design plans. -Conducting shoreline grading and stabilization efforts while AVOIDING the removal or disturbance of the existing submerged Willow Tree inside the cove inlet area. - Site preparation and clearing, including the marking of potential underground utilities. - Erosion control and site restoration - Final inspection and punch list completion

Bid Results

Playgrounds / Parks / Athletic Fields

$39,627.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
532
Active Projects
277
Bidding Soon
3,814
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2025

December 1, 2025

Project location map

33666 N Cove Rd, Grayslake, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.