BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2026 at 7:00 PM

Updated January 24, 2026

Site work and new construction of a mixed-use development in East Bridgewater, Massachusetts. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

As of January 23, 2026, the East Bridgewater Building Committee has approved the award of a general contracting firm. Details regarding subcontractor bidding have not been determined yet. Construction could begin in spring 2026 at the earliest. The Central ES project is being completed in collaboration with the Massachusetts School Building Authority (MSBA). The proposed project is for the construction of a new 108,000 GSF elementary school. The location of the building will be on the same site and constructed on the two existing softball fields behind the existing school. Once the new building is complete and occupied, the existing school will be abated, demolished and graded so the softball fields can be replaced where the current school stands. These replacement fields will be synthetic turf. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Question Deadline 11/14/2025 at 5:00 PM ET All questions must be submitted in writing by email t o: Matthew Gulino LEFTFIELD Project Management Owners Project Manager (OPM) mgulino@leftfieldpm.com

Award

Educational

$100,928,707.00

Public - City

New Construction, Site Work

74

57

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
13
Bidding Soon
2,342
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2025

March 2, 2026

Project location map

107 Central St, East Bridgewater, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.