BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 31, 2026 at 8:00 PM

Updated August 5, 2026

Renovation of an educational facility in East Bridgewater, Massachusetts. Completed plans call for the renovation of a educational facility.

Prequalification of Elevator FSB for the Central Elementary School Project - New Construction on Adjacent Site Project Location- 107 Central St. East Bridgewater, MA 02333 Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Please direct any questions by email only to alyssa.chatani@leftfieldpm.com before 8/7/26 @ 2:00 P.M. Interested Trade Contractors are sought for the following categories of work, at the estimated values indicated: Elevators $220,000 The Estimated Total Construction Cost for the project is $100,928,707. The Central Elementary School project design calls for a new approximately 108,000 gsf elementary school serving approximately 510 students in Pre-K through Grade 2. The new school will be located on the existing Central Elementary School campus at 107 Central Street in East Bridgewater, Massachusetts. The project includes construction of a new school building, associated site improvements, athletic fields, parking, and supporting infrastructure. The construction delivery method is Construction Manager at Risk (CM at Risk) in accordance with Massachusetts General Laws Chapter 149A. Gilbane Building Company was selected as the Construction Manager and has been an instrumental partner in developing construction logistics and phasing for the project. The new Central Elementary School will be constructed while the existing school remains operational, allowing students and staff to continue occupying the current building throughout the entirety of construction. Extensive site preparation, including a preload program to address site settlement, is being completed in advance of building construction. Existing access to the school will be maintained throughout construction, with carefully coordinated traffic management, pedestrian safety measures, and phased construction activities implemented to minimize disruptions to school operations. Following completion and occupancy of the new school, the existing building will be demolished, and the remaining site improvements and athletic fields will be completed.

GC Bidding

$100,928,707.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
756
Active Projects
360
Bidding Soon
4,518
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2026

January 1, 2027

Project location map

107 Central St, East Bridgewater, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.