BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 11, 2025 at 7:00 PM

Updated December 4, 2025

Site work and paving for a mixed-use development in San Antonio, Texas. Completed plans call for site work for a educational facility; water / sewer project; playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.

Bartlett Cocke General Contractors has been selected at the CM at Risk Contractor for this project. The project will be bid out in two separate packages. This award is for Package 1 only, which includes the following scopes: concrete, steel and metals, athletic fields and associated equipment, tennis courts, elevators, plumbing, in-slab building pad electrical, earthwork and asphalt, erosion control, site improvements, and site utilities. Package 2 for the balance of the work will be awarded at a later date.

Post-Bid

Educational

$620,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
261
Active Projects
94
Bidding Soon
2,131
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2025

January 2, 2026

Project location map

7173 FM1628, San Antonio, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.