BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 5, 2026 at 7:00 PM

Updated January 6, 2026

Site work for a water / sewer project in Vicksburg, Mississippi. Completed plans call for site work for a water / sewer project.

The work consists of furnishing all plant, labor, materials, and equipment for constructing four grade control structures in Tate County, Mississippi. Principal features of the work include mobilization and demobilization, clearing and grubbing, excavation, backfill, embankment, stone placement, storm water pollution prevention, and environmental protection. The estimated completion time is 105 calendar days after receipt of the Notice to Proceed. The contractor shall begin performance within 10 calendar days and complete it within 105 calendar days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work to be performed consists of furnishing all necessary plant, labor, materials, and equipment, and constructing four (4) grade control structures in Tate County, Mississippi. Principal features of the work for the grade control structures include mobilization and demobilization; clearing and grubbing; excavation, backfill, embankment, and control of water; storm water pollution prevention; and environmental protection. Pursuant to FAR 36.204(f), the magnitude of the proposed construction project is between $1 million and $5 million. The estimated completion time for the subject requirement is 105 calendar days after the date the contractor receives the Notice to Proceed. The estimated quantity and unit of measure listed in the bidding schedule is one (1) Job for each for the following: Item numbers 0001 - Mobilization and Demobilization; 0002 - Clearing and Grubbing; 0003 - Environmental Protection Features; 0004 - Grade Control Structure 1; 0005 - Grade Control Structure 2; 0006 - Grade Control Structure 3; 0007 Grade Control Structure 4; and 0008 - Erosion Control.

GC Bidding

Water / Sewer

$5,000,000.00

Public - Federal

Site Work

26

15

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
31
Bidding Soon
364
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2026

March 16, 2026

Project location map

Multiple Locations, Vicksburg, MS


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.