BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 1, 2025 at 7:00 PM

Updated December 2, 2025

Site work for a bridge / tunnel in Anchorage, Alaska. Completed plans call for site work for a one-story above grade bridge / tunnel.

Sealed bids are requested for ARRC MP 102.5 Emergency Repair Culverts. Bidders are invited to participate in a site visit at the specified location with required PPE. The envelope for submitting offers must be clearly marked with the offeror's name, ITB number, date and time for receipt of offers, and the project name. Bidders are responsible for understanding all terms, conditions, and specifications, regardless of attending the site visit. Bids must be submitted in a sealed envelope and received by the specified time. Submission by e-mail or facsimile is not accepted. All bids must be complete and on the provided forms. Additional instructions and conditions are enclosed. It is the bidder's responsibility to seek clarification on any aspect of the bid as needed. Scope of Work The scope of this project is to mitigate structural issues of three 60-Inch diameter structural plate pipe culvert structures located at ARRC MP 102.5. These structures convey water from Rabbit Creek into the Cook Inlet in South Anchorage. This bid package presents multiple options for this mitigation effort. The Contractor may elect, but is not required, to provide bids all options outlined herein. ARRC will select the option that is in the best interest of ARRC. The two (2) options presented herein are as follows: 1. Install New CBD: Install a new single span, 28-foot long, Owner furnished Concrete Ballast Deck (CBD) span supported by Owner furnished concrete pile caps, using Owner furnished pipe pile. Owner furnished PS-31 structural steel sheet pile will be used to construct new bulkheads at each abutment. Each bent will consist of an array of pipe piles driven to the driving resistance and minimum penetration specified herein and on the Plans. 2. Partial Replacement New Pipe: Remove and replace the first 50-feet of the legacy 60-inch diameter structural plate pipe culvert, removing the culvert from its outlet to the splice location designated on the Plans between the Seward Highway and the tracks. The removed pipe will be replaced with new pipes as outlined herein. The new pipes will be slipped a minimum of 3-feet over the legacy structural steel plate pipes. The annuli of the pipes will be grouted prior to the placement of a headwall at the location of the joint. A new headwall will also be constructed at the outlet of the three (3) new pipes.

Post-Bid

Bridges / Tunnels

$3,000,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
3
Bidding Soon
154
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 25, 2025

January 26, 2026

Project location map

15222 Seward Hwy, Anchorage, AK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.