Renovation of a power facility in Fort Defiance, Arizona. Conceptual plans call for the renovation of a power facility.
Kayenta 230kv Transformer No 2 Replacement Questions Due November 19, 2025 by 5:00 p.m. (DST) Execution of Contract No later than January 5, 2026 Inquiries: If there are any questions, firms Avis Jimm, Contract Administrator, at (928) 729-6243 or via email avisj@ntua.com. NTUA will only respond to questions related to this RFP prior to the date indicated above. All emails should have "Engineering Services - Kayenta 230kV Transformer No. 2 Replacement - QUESTIONS" in the subject line. 1. Design to replace one (1) 230:115/69kV, 30/40 MVA transformer at NTUA's Kayenta 230 substation (36.782494, -110.236789). Transformer is on order and will be delivered in the 3rd quarter of 2026. 2. Foundation and existing equipment shall be designed for removal and replaced with new foundation. 3. Removal of existing the transformer and tertiary shall remove the redundant service power to NTUA and WAPA existing control buildings. Engineer firm shall design a new redundant service to both control buildings off the 69kV Bus. Engineering firm shall coordinate with WAPA to meet their SST requirements. 4. Engineering firm shall verify that the existing SEL 587 and SEL 351 are adequate or needs upgrading in existing control building. Engineering firm shall solicit the relay upgrades if required. SEL 735 shall be added to T1 and T2 circuits. 5. The design requirements outlined below reflect NTUA's general expectations for the consultant in providing the service. Further clarification of specific project requirements shall be provided through RFP General Overview of Objective, RFP Q&A, and during the kickoff meeting. The method of Contractor Selection has not been Determined at this time
Conceptual
Power Plant
$500,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 5, 2026
To Be Determined, Fort Defiance, AZ
Related To This Project
Fort Defiance, AZ
Bid Date: Nov 21 2025
Fort Defiance, AZ
--
Fort Defiance, AZ
--
Fort Defiance, AZ
Bid Date: Dec 01 2025
Fort Defiance, AZ
Bid Date: Nov 05 2025
Fort Defiance, AZ
Bid Date: Nov 14 2025
Fort Defiance, AZ
Bid Date: Oct 17 2025
Fort Defiance, AZ
Bid Date: Sep 24 2025
Fort Defiance, AZ
--
Fort Defiance, AZ
Bid Date: Oct 17 2025
Fort Defiance, AZ
--
Fort Defiance, AZ
--
Fort Defiance, AZ
Bid Date: Sep 12 2025
Fort Defiance, AZ
Bid Date: Sep 16 2025
Fort Defiance, AZ
Bid Date: Aug 28 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.