BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 11, 2025 at 7:00 PM

Updated November 15, 2025

Site work for a transportation facility in Spokane, Washington. Completed plans call for site work for a one-story above grade transportation facility.

Provide the Five Mile Mobility Hub Preliminary Design. Spokane Transit Authority is requesting proposals from qualified proposers to furnish the preliminary design for the Five Mile Mobility Hub, with the intent to award a one-year contract. Deadline to submit questions, requests for clarifications, or approved equals, including redline changes to the sample agreement: October 31, 2025, 4:00 PM, Pacific Time... Project Background The Five-Mile Park and Ride is located on the corner of N Ash St and W Five-Mile Road. Currently, two routes use the Five-Mile Park and Ride, Route 4, a High Performance Transit (HPT) line with 15-minute frequency and the highest annual passenger boardings in Spokane Transit Authority's (STA) system, and Route 662, which provides two outbound trips to Eastern Washington University (EWU) on weekday mornings. The site is geographically and topographically constrained with Austin Road and a steep hillside on the West, high-density residential to the North, and commercial, office and retail development to the South and East. The Five-Mile Park and Ride is a key transit facility for North Spokane and serves as the northern terminus for STA's highest ridership route, but current low utilization of parking facilities and geographical limitations suggest STA has an opportunity to modify the site for use as a mobility hub. Project Purposes and Outcomes The purpose of this study is to: 1) research and document elements that could be used to design a successful network of mobility hub sites within STA's Public Transportation Benefit Area (PTBA); and 2) identify elements that could be successfully applied to create a mobility hub at the Five-Mile Park and Ride. STA's Comprehensive Plan, Connect Spokane, calls to assess existing transit centers for implementation of mobility hubs. These hubs will support travel modes such as carshare, bikeshare, dockless vehicles, shared autonomous vehicles and ridesharing companies (i.e. Uber, Lyft, etc.). The Five-Mile Park and Ride has been identified as a potential mobility hub and this study will evaluate and determine alternatives for implementation.

Post-Bid

Transportation Terminals

$190,674.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
30
Bidding Soon
294
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2025

December 15, 2025

Project location map

To be determined, Spokane, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.