Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 12, 2025 at 7:00 PM
Updated December 13, 2025
Site work for a power facility in Ames, Iowa. Design plans call for site work for a power facility.
ITC (an independent transmission company) is building a new 161kV substation in the Prairie View Industrial Center on the south side of Lincoln Way adjacent to Ames' 161 kV line. ITC has requested to interconnect to Ames' existing 161 kV line. The purpose of this substation is for ITC to provide Alliant Energy with the necessary capacity to service Alliant's anticipated new customers in this vicinity and to transfer some of its existing distribution load to the transformer(s) planned as part of this substation. This CIP project is to fund a 1/3 share of this substation in order for Ames to secure capacity and transmission path rights as a joint owner in this substation. The project will also fund the professional services necessary to support this interconnection effort which will require replacement of relays at the Ames Plant 161 kV substation and design review of ITC's plans for metering, relaying, controls, and transmission line modifications necessary to complete this interconnection. Ames' reliability will be enhanced as Alliant adds an additional 161 kV line from its Fernald substation. Under the interconnection and Joint Ownership Agreements, MidAmerican Energy Company will remain as Ames' Transmission Operator. The project is included in the City's 2025-2030 Capital Improvement Program (CIP). As of December 12, 2025, information regarding design firm and general contractor selection timeline has not been released. Further details regarding construction and completion timelines have not been disclosed. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Power Plant
$4,000,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2026
3700 E Lincoln Wy, Ames, IA
Related To This Project
Ames, IA
Bid Date: Jan 07 2026
Ames, IA
Bid Date: Jan 20 2026
Ames, IA
Bid Date: Jan 27 2026
Ames, IA
Bid Date: Jan 21 2026
Ames, IA
Bid Date: Jan 08 2026
Ames, IA
Bid Date: Dec 15 2025
Ames, IA
Bid Date: Dec 16 2025
Ames, IA
Bid Date: Dec 19 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.