BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2025 at 7:00 PM

Updated December 5, 2025

Site work and paving for a mixed-use development in Santa Clara, Texas. Completed plans call for site work for a residential development; water / sewer project; road / highway; and for paving for a road / highway.

The work involves the installation of streets, drainage, sanitary sewer, water, dry utility conduit, and SW3P infrastructure for a single-family residential subdivision in Guadalupe County, Texas for Lennar Homes of Texas Land and Construction, Ltd. The infrastructure to serve a 107-lot single family residential subdivision with associated water, sanitary sewer, drainage, roadways, and dry utilities. Question Deadline 11/25/2025 at 5:00 PM CT Submit all questions through email to rbarrera@cudeengineers.com or to khudek@cudeengineers.com. Questions can also be submitted through online portal. Each Bid must be accompanied by a Bid Bond or a certified or cashier's check, acceptable to the Owner, in an amount not less than two percent (2%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract Documents and execute the Bonds on the forms provided and provide the required insurance certificates within seven (7) days after the date Contract Documents are received by the Contractor. The Ownerreserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid. The successful bidder, if any, will be the responsible bidder which in the Board's judgment will be most advantageous to the District and result in the best and most economical completion of the Project. The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and the Contractor agrees that the Contract Documents can be terminated if the Contractor knowingly or intentionally fails to comply with a requirement of that subchapter. Approximate start date for construction is January 5th, 2026 The schedule milestones that need to be identified include the following: Mobilization Rough Site Grading Wet Utility Trenching and Installation Conduit Installation Drainage Structures - Inlets, Culverts, etc. Drainage Channels Subgrade, Curb & Paving Completion and Field Acceptance

Post-Bid

Residential Subdivision

$4,000,000.00

Public - County

Paving, Site Work

66

10

18

7

Subscribe For Documents

93 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
289
Active Projects
132
Bidding Soon
2,551
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2025

January 5, 2026

Project location map

Weil Rd, Santa Clara, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.