BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 25, 2025 at 7:00 PM

Updated November 26, 2025

Site work for an industrial development in Laredo, Texas. Completed plans call for site work for a industrial development.

The Contractor, subject to the terms and conditions set forth below, shall perform the following specified duties, without limiting or restricting the volume of services and solely for the convenience of the contractor, the service to be performed shall, in general, comprise the following welding work: Steel, Stainless Stee, Aluminum, and other allow. 2.1 Shop Work - covers welding work in the contractor's shop, such as repairs to equipment or items brought to the shop that require welding or fabrication at the shop. Any job which is predominately fabrication in the shop (over 50%) shall be considered shop work even if the job required field installation of the finished item by the contractor. 2.2 The Contractor shall provide services of competent and/or certified welders upon request by the manager of the Solid Waste/Landfill and/or his designated representative. 2.3 All welding services and welding equipment/apparatus shall be in compliance with the Department of Labor Occupational Safety and Health Standards, Title 29, Chapter XVII, part 1910, Subpart Q, Sections 1910.251through 1910.254 inclusive, the National Fire Code, and all other applicable Federal, State, and/or Local codes and regulations. 2.4 Response time to call to work: The Contractor must respond to an emergency call within one (1) hour. The Contractor must respond to a normal (i.e., non-emergency) call made between the hours of 8:00 AM -5:00 PM Monday thru Friday, within two (2) hours. The term of this contract shall be for a period of one (1) year beginning as of the date of its execution. The contract may be extended for three (3) additional one (1) year period. Should the vendor desire to extend the contract for the additional one-year period, it must notify the City in writing no later than sixty (60) days before the expiration date of the prior term.

Post-Bid

Industrial

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
11
Bidding Soon
150
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2025

December 19, 2025

Project location map

To be determined, Laredo, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.