BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 5, 2025 at 7:00 PM

Updated November 21, 2025

Site work, renovation and addition to a mixed-use development in Elgin, Illinois. Completed plans call for the addition of a 3,945-square-foot, one-story above grade office development; one-story above grade office development; 585-square-foot, one-story above grade office development; 550-square-foot, one-story above grade water / sewer project; one-story above grade office development; and one-story above grade water / sewer project.

The project involves work at three separate buildings for the Fox River Water Reclamation District: Main Control Building (Building C) – North Sewage Treatment Plant, 777 Cliford Avenue, Elgin, IL 60123: Includes interior renovations and a 550 SF addition for a Break Room, Training Area, and Kitchenette. Also includes associated site improvements. Administration Office Building (1950) (Building D) – Dana Drive, Elgin, IL 60123: Includes interior renovations and a 585 SF addition for a new Break/Training Room and Locker Room areas. Also includes associated site improvements. Administrative Office Building (Building E) – 1957 N La Fox Street, South Elgin, IL 60177: Includes interior renovations and a 3,945 SF addition for new Offices, Training Room, Workspaces, and Board Room. Also includes associated site improvements. Prospective bidders should contact the specified person at Lamp Incorporated to be placed on the bid list and to gain access to SmartBid, where drawings can be downloaded. All contractors must have a Lamp Incorporated Qualification Statement on file, updated within the last year, and submit it by the specified deadline. A Bid Bond or Certified Check in the amount of 10% of the bid must accompany the Bid Form. The successful bidder is required to furnish a Performance Bond and Labor and Material Payment Bond in an amount equal to 100% of the bid amount, with sureties approved by the owner, and a Certificate of Insurance within ten days of the contract award. The successful bidder must pay Prevailing Wage and submit certified payroll records according to the Prevailing Wage Act. All contractors must comply with the requirements of the Fox River Water Reclamation District Ordinance No. 966 and submit the necessary documentation prior to or with the bid. Failure to submit these documents may result in bid rejection. The Board of Trustees reserves the right to reject any and all proposals or waive any bid irregularities. This project is tax exempt. *Parties interested in obtaining the construction documents should contact the Construction Manager directly.

Post-Bid

Water / Sewer

$3,000,000.00

Public - County

Addition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
7
Bidding Soon
2,971
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2025

December 5, 2025

Project location map

777 Cliford Avenue Dana Drive 1957 N La Fox Street, Elgin, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.