BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 15, 2025 at 7:00 PM

Updated December 16, 2025

Site work and paving for a mixed-use development in Walterboro, South Carolina. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The project consists of curb, gutter, sidewalk, and drainage improvements on SC 303 in Walterboro, approximately 3750 linear feet. The road must be open to traffic at all times during construction. Utilities may be present along specific routes. The contractor will coordinate with the local utility providers and make the necessary adjustments. All road work is to be performed within the existing or obtained Right of-Way of the road and construction easements. Question Deadline 12/04/2025 at 11:00 AM ET Questions regarding this solicitation must be submitted via email to Carla Harvey, County Engineer, at charvey@colletoncounty.org

Bid Results

Sidewalks / Parking Lot

$1,094,629.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
9
Bidding Soon
1,045
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2025

January 12, 2026

Project location map

Multiple Locations, Walterboro, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.