Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 12, 2025 at 7:00 PM
Updated November 13, 2025
Demolition, site work, renovation and addition to a mixed-use development in Taylor, Texas. Conceptual plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.
Multi-Purpose Facility – Auditorium & Instructional Spaces Multipurpose Addition at THS to serve student curricular and extracurricular activities, including: Auditorium for student curricular, extracurricular, and UIL programs Collaborative and flexible classroom and support spaces Rehearsal and instructional spaces adaptable for instructional programs such as UIL, music, dance, theatre, and other student groups. General-use common space suitable for student exhibitions, student competitions, student performances, professional development and community events Taylor Middle School - Additions and Renovations? Science classroom and lab renovations and additions Classroom renovations Traffic flow and parking upgrades Safety infrastructure Cafeteria renovations Campus modernization and technology infrastructure Track and field enhancements less than 1,000 seat capacity – bringing up to current safety standards Physical Education and Athletic renovations and additions Science, Technology, Engineering, Mathematics (S.T.E.M.) SPACES? PK-8 Renovations to create S.T.E.M.-focused instructional spaces at elementary and middle schools ? Supports student participation in robotics, science fairs, and innovative project-based learning Technology,? Safety + Security Upgrades to surveillance, access control, emergency communications, and technology infrastructure Addresses aging infrastructure Land? Acquisition? Purchase of future school sites to support projected enrollment growth Aligns with projected housing growth and capacity demands Comprehensive Design and Planning ? Funds future facility design and planning to align with 10-Year Long-Range Plan Enables phased project readiness as enrollment increases CAPITAL MAINTENANCE Includes system replacements (HVAC, roofing, drainage) ? Targets high-cost deferred maintenance projects at existing campuses TRANSPORTATION ? Replaces aging school buses and support vehicles Ensures compliance with safety, emissions, and capacity standards Additional Vehicles to support curricular and extracurricular activities SURFACE IMPROVEMENTS Surface Improvements - Artificial Turf - Baseball, Softball & Other Sites with less than 1,000 seat capacity To address usability and durability This project is part of the school district’s bond that passed. As of November 12, 2025, information regarding design firm, construction manager, and general contractor selection has not been released. Further details regarding firm construction and completion timelines have not been disclosed.
Conceptual
Educational
$147,000,000.00
Public - City
Addition, Demolition, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 26, 2026
Multiple Locations, Taylor, TX
Related To This Project
Taylor, TX
Bid Date: Nov 13 2025
Taylor, TX
Bid Date: Dec 15 2025
Taylor, TX
--
Taylor, TX
--
Taylor, TX
Bid Date: Jul 31 2026
Taylor, TX
Bid Date: Dec 19 2025
Taylor, TX
Bid Date: Nov 21 2025
Taylor, TX
--
Taylor, TX
--
Taylor, TX
Bid Date: Nov 05 2025
Taylor, TX
--
Taylor, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
