BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 28, 2025 at 7:00 PM

Updated November 29, 2025

Renovation of an educational facility in Ormstown, Quebec. Completed plans call for the renovation of a educational facility.

Reference number: 20104115 Deadline for receipt of complaints 2025-11-17 There is provision for a tendering process for each tender no Expected duration of the contract without options (in months) 6 The project consists of updating the heating system and eliminating GHGs. To save time, the CS made a pre-purchase of a high-temperature hot water-hot water heat pump that the contractor will appropriate and install in the project. The other related elements are provided on the documents of A.O Delivery schedule The schedule indicated in the contract is from December 15 to March 14, but practically speaking, here is our planning: Preparation of the work: Project adjudication by the client: December 3, 2025 Sending the workshop drawings of the main equipment: December 9, 2025 Approval of shop drawings by the professional: December 10, 2025 Deadline for ordering main equipment to suppliers: 12 December 2025 Removal of the outer tank: Start of drainage and cleaning work: As soon as possible after the contract is awarded. Deadline for completion of the tank and backfill removal work: March 6, 2026 First internal mobilization: . The first mobilization includes all the work indicated in the plans and specifications, except for: The installation of the TP-7 heat pump and the demolition of the outdoor fuel tank and other related works. Included the thermal insulation of the pipes. The insulation contractor will have to carry out the work in 2 mobilization (preparation plus finishing). . Start of preparation work: February 9, 2026. Workers must be present at the site on this date to start the work. End date of the Preparation Work: February 27, 2026. Second mobilization (finalization): The finishing phase includes the installation of the heat pump, balancing, commissioning and finishing the insulation in order to operate the heat pump without condensation on the pipes. Start of Work: Upon receipt of the heat pump scheduled for March 3, 2026. The contractor will still have to respect the deadline for completion of the work indicated below if a 2-week delay occurs, therefore if a receipt of the heat pump is made on March 17, 2026.

Post-Bid

Educational

$200,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
387
Active Projects
151
Bidding Soon
2,797
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 27, 2025

December 15, 2025

Project location map

1597 Rte 138A, Ormstown, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.