BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 18, 2025 at 7:00 PM

Updated November 19, 2025

Asbestos abatement and renovation of an educational facility in Cullom, Illinois. Completed plans call for the renovation of a educational facility; and for asbestos abatement for a educational facility.

Asbestos Abatement for 2025 Music Room Renovations at Tri-Point High School, 100 Van Alstyne Street in Cullom, IL. The work is to remove asbestos-containing plaster ceiling from the music room and flooring from the music room, entry corridor and adjacent storage room utilizing gross removal methods and mastic removal by grinding. The Date of Commencement is December 3, 2025. The Date of Substantial Completion is December 12, 2025.

Bid Results

Educational

$23,327.00

Public - City

Asbestos Abatement, Renovation

3

8

5

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
337
Active Projects
184
Bidding Soon
2,626
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2025

December 3, 2025

Project location map

100 E Van Alstyne St, Cullom, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.