Published December 16, 2025 at 7:00 PM

Updated December 17, 2025

Demolition, site work, paving and new construction of a civil project in Dexter, Minnesota. Completed plans call for the demolition of a bridge / tunnel; and road / highway.

The work consists of bridge removal (50513 & 50514), bridge construction (50604 & 50605), excavation, grading, aggregate base, full depth reclamation, bituminous surfacing, erosion control, turf establishment, and appurtenant construction. The project is located on Csah 7 (280th Street / 660th Avenue) over the North Branch Root River in Sections 2 and 35, Dexter and Sargeant Townships, Mower County, Minnesota. The project involves replacing Bridge No. 50513 and Bridge No. 50514 with new Bridge Nos. 50605 and 50604, including approach roadway reconstruction and related work, with a combined project length of approximately 0.4 miles. Major quantities include: 5,450 CY common excavation, 1,020 ton aggregate base (Class 2), 4,444 SY full depth reclamation, 1,700 CY haul full depth reclamation, 630 ton shoulder base aggregate (Class 2), 826 ton Type SP 12.5 wearing course mixture (3,c), 850 ton Type SP 12.5 nonwearing course mixture (2,b), 187 CY structural concrete (3B52), 103,660 lb reinforcement bars (epoxy coated), 920 lb reinforcement bars (stainless, 75 ksi), 6,331 SF bridge slab concrete (3Ünpcm), 2 LS remove existing bridge, 800 LF cast-in-place concrete piling (12" & 16"), 280 LF filter berm (Type 5), 1,400 LF silt fence (Type MS), 8,000 SY rolled erosion prevention (Category 25), and 3.06 AC seeding, along with associated items. Bids shall be electronically submitted via Questcdn.com. Each proposal must be accompanied by a bidder's bond or certified check in the amount of at least 5% of the total amount of the proposal, made payable to the Treasurer of Mower County, Minnesota. The Board of County Commissioners reserves the right to reject any or all proposals and to waive defects therein and to award to other than the lowest bidder if it is in the best interest of the county. Minimum wage rates to be paid by contractors have been predetermined and are subject to the Work Hours Act of 1962 and implementing regulations. Compliance with Equal Employment Opportunity laws and Minnesota Human Rights statutes is required. If a bidder employs more than 40 full time employees in any state, a compliance certificate from the Minnesota Department of Human Rights is required to bid. Direct questions about this Project, including pre-bid questions, to the following individual: Mitch Wenum, PE Mower County Engineer Mower County Highway Department 1105 8 th Avenue NE Austin, MN 55912 mitchw@co.mower.mn.us 507-437-7718 All requests for clarifications of this Bidding Package must be in writing and submitted via email to the Engineer. The request for clarification needs to be as specific as possible, indicating the Proposal Section, Plan Sheet or Pay Item in question. All responses to requests for clarifications will be emailed to all plan holders as clarifications are issued. The County will not be bound by the responses to the clarification requests. Contractors shall only rely on the Plans, the Standard Specifications for Construction, Special Provisions, Addendums, and other Contract documents. The 2025 Edition of the Minnesota Department of Transportation Standard Specifications for Construction shall govern the work under this Contract, except as modified or altered in these Special Provisions. S-1.2 This work will include but not be limited to: A The replacement of Existing Bridge No. 50513 with New Bridge No. 50605, and B The replacement of Existing Bridge No. 50514 with New Bridge No. 50604, and C The Regrading and Resurfacing of the approach roadways to both bridges. S-1.3 It is the intent of this Contract that the work on both bridges be undertaken concurrently. Both bridges will be closed to all traffic at the same time. The roadway (CSAH 7) between the bridges will also be closed to all traffic (except for local access) for the duration of the Project.

Award

Bridges / Tunnels

$2,042,728.00

Public - County

Demolition, New Construction, Paving, Site Work

79

3

4

6

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
63
Bidding Soon
641
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2025

January 5, 2026

Project location map

280 St & 660 Ave, Dexter, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.