BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 16, 2025 at 7:00 PM

Updated November 17, 2025

This is a service / maintenance or supply contract in Santa Barbara, California. Contact the soliciting agency for additional information.

This Project is located at the Carpinteria Street Bridge (Bridge) over Sycamore Creek between South Soledad Street and South Canada Street. The Bridge is listed as structurally deficient and is to be replaced with a new bridge designed to meet current City, American Association of State Highway and Transportation Officials, and Caltrans standards while minimizing adverse effects on Sycamore Creek and protecting, preserving, and enhancing its adjacent riparian habitat. The Project primarily consists of, but is not limited to, the following: o Remove and replace a timber bridge and roadway approaches; o Demolition of retaining walls; o Relocate utilities (Water and Waste Water); o Construct creek transition walls; o Construct sidewalks and other minor concrete items; o Realign the roadway; o Plant riparian trees and vegetation and install irrigation systems; o Install storm drain facilities and post construction BMPs; o Install streetlights; and o Protect existing utilities per the Project's Plans and Specifications. The Project has obtained the following environmental permits and approvals: o Regional Water Quality Control Board Section 401 Water Quality Certification; o California Department of Fish and Wildlife; o Endangered Species Act Section 7(a)(2) Biological Opinion; and o U.S. Department of the Army Corps of Engineers Section 404 Nationwide Permit. Bids for the construction contract are due in March of 2026. Construction is tentatively scheduled to start in May of 2026 and is anticipated to conclude in the summer of 2027. The construction contract is for 230 working days. The services to be provided by the Consultant shall include, but not be limited to, those listed below. The services include specific tasks as well as goals which the consultant is expected to strive to reach. The term construction phase, as it pertains to this Request for Proposals (RFP), shall mean the Project's pre-construction, construction, and close-out phases. Task 1 - Constructability Review Services Task 2 - Construction Management and Inspection Task 3 - Labor Compliance Task 4 - Acceptance Testing Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Question Deadline 11/12/2025 at 12:00 PM PT Online Q&A Yes The method of Contractor Selection has not been Determined at this time.

Conceptual

Bridges / Tunnels

$7,365,000.00

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
59
Bidding Soon
1,082
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2025

June 4, 2026

Project location map

Carpinteria St, Santa Barbara, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.