BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2025 at 7:00 PM

Updated December 3, 2025

Site work for a water / sewer project in Falls City, Texas. Completed plans call for site work for a one-story above grade water / sewer project.

Bids are invited for several items and quantities of work as follows: 1. Replacing and installing new 6" PVC main line on Gilbert St. from N. Pecan St. to past N. Hopkins St., N. Hopkins St., Terrell St. from N. Hopkins St. to N Nelson St., N. Nelson St. from W. Cooper St. to Terrell St., W. Cooper St. form N. Hopkins St. to W. Irvin St. 2. When all tests are accepted, the existing water services along these new lines will be connected to the new main line. 3. The existing fire hydrants will be connected to the new main line as well. Bid/Contract Documents, including Drawings and Technical Specifications, are available at specified locations. Hard copies may be obtained by depositing $100 with the Engineer for each set, refundable if returned in good condition within 10 days after the bid opening. An electronic copy is available free of charge. Bidders must inform themselves of all addenda issued. Submit questions in writing by the specified deadline. A bid bond of 5 percent of the bid, issued by an acceptable surety, is required for contracts exceeding $100,000. Certified checks or bank drafts payable to the City of Falls City or negotiable U.S. Government Bonds (at par value) may be submitted in lieu of the Bid Bond. At least the federally determined prevailing (Davis-Bacon and Related Acts) wage rate, as issued by the Texas Department of Agriculture Office of Rural Affairs and contained in the contract documents, must be paid. The successful bidder must ensure against discrimination based on race, color, religion, sex, sexual identity, gender identity, or national origin. The City of Falls City reserves the right to reject any or all bids or to waive any informalities in the bidding. All contractors/subcontractors debarred, suspended, or otherwise excluded from or ineligible for participation on federal assistance programs may not undertake any activity under this project. Bids may be held for a period not to exceed 60 days for review and investigation prior to contract award. Question Deadline 11/24/2025 at 5:00 PM CT Please submit questions in writing through email to : dmcada@rak-eng.com *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$1,000,000.00

Public - City

Site Work

13

6

9

3

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
82
Bidding Soon
1,328
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2025

January 1, 2026

Project location map

To be determined, Falls City, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.