BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 3, 2025 at 7:00 PM

Updated December 4, 2025

Site work and paving for a mixed-use development in Hondo, Texas. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.

This project involves grooving the full length of concrete runway 17L-35R, in general accordance with FAA AC 150/5370-10H Item P-621, to improve stormwater drainage from the surface. Question Deadline 11/28/2025 A CERTIFIED CHECK or an acceptable bid bond in an amount of not less than five percent (5%) of the total bid shall accompany each bid as a guaranty that, if awarded the contract, the bidder will promptly enter into contract with the City of Hondo and furnish bonds on the forms provided. BIDDERS are expected to inspect the site of the work and to inform themselves of all local conditions. Time of completion shall be 30 calendar days including Saturdays, Sundays, and legal holidays. Liquidated damages = $1,000 per day THE SUCCESSFUL BIDDER OR BIDDERS will be required to furnish a Performance Bond, Payment Bond, and Maintenance Bond as stipulated in the specifications. NO BID may be withdrawn after the scheduled closing time for receipt of bids for at least ninety (90) calendar days. THE CITY reserves the right to reject any and/or all bids, waive any and/or all formalities, and award the bid as it appears most beneficial to the City Estimate: $225,000 - $300,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project #1: Runway 17R-35L Decommissioning - This project includes the remarking of runway 17R-35L to be decommissioned, and the pressure washing and remarking of the approximately 6,000 LF primary runway 17L-35R to reflect its redesignation to 17-35. Project #2: Runway 17L-35R Resurfacing - This project involves grooving the full length of concrete runway 17L-35R, in general accordance with FAA AC 150/5370-10H Item P-621, to improve stormwater drainage from the surface. Please submit questions for this project no later than 72 hours prior to bid opening through in the Q&A portal.

Post-Bid

Transportation Terminals

$300,000.00

Public - City

Paving, Site Work

6

16

2

5

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
25
Bidding Soon
1,168
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2025

January 1, 2026

Project location map

700 Vandenberg Rd, Hondo, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.