BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2025 at 7:00 PM

Updated November 27, 2025

Site work and paving for a bridge / tunnel in Tyler, Texas. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

District/ Division : Tyler County (Controlling Project) : Smith Let Type : Local District Let Highway (CCSJ) : IH0020 Type of Work (Controlling Project) : Bridge Preventative Maintenance Bidder Pre-qualification Waiver : No Limit From: Various Bridges in Limit to: The Tyler District Length: 0.01 Guaranty: $13000 Project Description : For the purpose of replacing damaged wingwalls. Working Day Type (Ccsj) : Working Days Max. Maximum Number Of Working Days : 118 "Prebid Q & A will be posted in 12 days & -8 hours. Please contact district with current questions." TXDOT - Bridge Preventative Maintenance - IH0020 Contractor questions on this project are to be addressed to the following individuals: Paul Schneider, P.E. Paul.Schneider@txdot.gov Josh Fulton, P.E. Josh.Fulton@txdot.gov

GC Bidding

Bridges / Tunnels

$646,985.00

Public - State/Provincial

Paving, Site Work

72

3

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
64
Bidding Soon
889
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.