Published January 22, 2026 at 7:00 PM

Updated January 23, 2026

Site work and new construction of a power facility in Jacksonville, Florida. Completed plans call for the construction of a power facility; and for site work for a power facility.

The work consists of installing a new 230kV, 3-element ring bus. A prefabricated control enclosure, which will contain preassembled relay panels, and will be installed at site by a third-party vendor described herein (the "Work"). Mobilization Site Surveying and establish baselines Site Preparation Receive and offload substation packager materials Install foundations for all structures and equipment Install ground grid, ground rods, and equipment ground tails Install conduits/cable trenches Backfill and compact site as necessary Install substation rock Install site access roads Install security fencing and gates Transport JEA provided materials and equipment from JEA storeroom Install 230 kV structures, bus, and equipment Install grounds to structures and equipment Finish conduit installation, pull cables, and terminate at yard equipment and inside the control house relay equipment Site Clean-up, sodding/seeding and disposal of debris General inspection by JEA Completion of all punch list items Upon JEA commencing the serving of load but not more than ninety (90) days beyond punch list completion, the Contractor shall inspect all 230kV electrical connections for hot spots. Demobilize The Complete scope of work is included in the Appendix A Technical Specifications. Planned Project Construction Start: January 5, 2026 Estimated Construction Substantial Completion: August 10, 2026 Question Deadline 12/02/2025 All Questions must be submitted in writing to the JEA Buyer listed herein at least five business days prior to the opening date. Questions received within five business days prior to the opening date. contact: Bill Hickey Manager, Supplier Diversity Programs and Procurement Services JEA hickwj@jea.com or jsebprogram@jea.com.

Award

Solar Power Generation

$5,960,000.00

Public - City

New Construction, Site Work

29

12

77

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
70
Bidding Soon
1,205
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2025

January 5, 2026

Project location map

1908 Blair Rd, Jacksonville, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.