Site work and new construction of a fire / police facility in Foley, Alabama. Completed plans call for the construction of a 9,500-square-foot, two-acre fire / police facility; and for site work for a fire / police facility.
The work is generally described as follows: construction of a new 150x80 (9,131, sq. ft.) 200 MPH, FEMA Rated, Hurricane 1st Responder Dual Use Facility with backup generator. The project consists of both building and site construction as identified in the construction documents. This project has to meet the latest version of FEMA 361 Safe Room Guidance and the latest version of ICC-500 requirements for safe rooms. Scope of Work: 2 Acres, Site work, Grading, Asphalt Paving, Curb Gutter, Seed/Sod, Outside Water & Sewer, Concrete Footing’s, Slab-on-Grade, CMU & Brick Veneer Exterior Walls, Structural Steel roof support & Misc. Steel, Pre-cast Hollow Core roof slabs, Single Ply Roofing, Hollow Metal Doors, Frames & Hardware, Paint, Metal Studs, Drywall/Insulation, Sealed Concrete Floors, Caulking, Toilet Acc., Toilet Partitions, HVAC, Plumbing, Electrical, 150 KW Generator Bid Bond Yes Project no- 25-032, S0325, DL 4909-25 Question Deadline 11/24/2025 at 5:00 PM CT All questions related to this bid must be documented through email and should be sent to Todd Stewart at tstewart@adamsstewart.com and Mike Pape at mpape@adamsstewart.com no later than 5:00pm Monday, November 24, 2025 Clarification from Architect; Regarding Davis-Bacon, this is a government funded project so the Davis-Bacon Act does apply and certified payroll will be required by the contractor and all subs. Addendum #1-#4 have been issued as of 12-3-2025.
Award
Fire / Police
$3,720,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 4, 2025
February 2, 2026
N Poplar St, Foley, AL
Related To This Project
Foley, AL
Bid Date: Dec 09 2025
Foley, AL
Bid Date: Dec 16 2025
Foley, AL
Bid Date: Dec 17 2025
Foley, AL
Bid Date: Dec 18 2025
Foley, AL
Bid Date: Dec 17 2025
Foley, AL
Bid Date: Dec 17 2025
Foley, AL
--
Foley, AL
Bid Date: Dec 02 2025
Foley, AL
Bid Date: Nov 12 2025
Foley, AL
Bid Date: Nov 05 2025
Foley, AL
Bid Date: Nov 05 2025
Foley, AL
Bid Date: Nov 05 2025
Foley, AL
Bid Date: Oct 22 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.