BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 21, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a sidewalk / parking lot in Odessa, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of April 21, 2026, all subcontracts and purchase orders have already been issued for this project. Counties : Pasco Road Name: SR 54 at SR 589 - Pedestrian/Wildlife Overpass Limits: 14571000 Project(s): 44931515201(*) Federal Aid No: N/A Total Roadway Length: 0.021 Miles Contract Days: 360 Total Bridge Length: 0.224 Miles Total Proposal Length: 0.245 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 60 Days Flex Start Description: The Improvements under this Contract consist of constructing a pedestrian overpass at SR 54 at SR 589 (Suncoast Trail). The existing Suncoast Trail will be reconstructed to accommodate the overpass at SR 54 and will maintain an at-grade crossing as well. The project is located in Pasco County. Prequalification required. Question Deadline 12/03/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - 001 - Pedestrian/Wildlife Overpass - SR 54 at SR 589

Award

Sidewalks / Parking Lot

$8,991,672.00

Public - State/Provincial

Paving, Site Work

78

8

7

Subscribe For Documents

75 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
298
Active Projects
131
Bidding Soon
2,185
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2025

February 9, 2026

Project location map

FL-54 & Suncoast Trail, Odessa, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.