BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 15, 2026 at 7:00 PM

Updated January 16, 2026

Site work and paving for a road / highway in Dunnellon, Florida. Completed plans call for site work for a one-story above grade road / highway.

As of January 15, 2026, this project has been awarded. All work for the 5-Year Capital Roadway Project shall be constructed in accordance with the Drawings and Specifications prepared by the City. Bids are to be submitted for furnishing, delivering, and installing all materials, equipment, and services, including labor for the work, which generally involves full depth reclamation (FDR) and paving of city streets identified in the City of Dunnellon 5-Year Capital Improvement Plan and in the bid documents. For this project, all contractors licensed by the State of Florida are invited to bid. Bids must be prepared using the Project Specifications and Drawings. Addenda will be sent via email to all plan holders. No addenda will be issued after December 8, 2025. A mandatory pre-bid meeting will be held at the specified location and time. Bid security is not required. The successful contractor will be required to furnish a Performance and Payment Bond in an amount equal to 100% of the Contract Price, secured from or countersigned by an agency or surety company authorized to do business in the State of Florida. The City reserves the right to waive formalities, waive any technical defects, reject any or all bids, and/or accept any bid which represents the lowest or best offer to the City. ONTRACT TIME: Construction time to achieve Substantial Completion is 60 consecutive calendar days from the date of the Notice to Proceed for each Fiscal Year roadway project. DESCRIPTION OF WORK: All work for the Project shall be constructed in accordance with the Specifications prepared by the City. Bids shall be submitted for furnishing, delivering and installing all materials, equipment and services, including labor for the Work, which generally involves the following activities: For the 5-Year Capital Roadway Project, the work involves full depth reclamation (FDR) of various roadways throughout the City, as identified in the City's 5-Year Capital Road Improvement Plan, which may be amended from time to time by the Dunnellon City Council. All questions concerning the bid documents and plans shall be directed to the Owner by email to cward@dunnellon.org. Any interpretation, correction or change of the bidding Documents will be made by Addendum Question Deadline 12/01/2025

Award

Roads / Highways

$1,674,254.00

Public - City

Paving, Site Work

5

8

4

9

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
7
Bidding Soon
997
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

February 16, 2026

Project location map

To be determined, Dunnellon, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.