Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 17, 2025 at 7:00 PM

Updated December 24, 2025

Renovation of a municipal facility in Los Angeles, California. Completed plans call for the renovation of a municipal facility.

Walk in Freezer Doors Replacement written questions due: -11-12-25 respondents may submit written questions regarding this rfb by e-mail to the purchasing analyst of this solicitation. please forward all emails to: ADELUNA@ISD.LACOUNTY.GOV Accessories to be Included: Door #5 The brand is North Star(Or equal), and stainless-steel L frame 36"x78" stainless steel materials interior & exterior of door. (3 1/2) inches urethane foam in place insulation. Freezer door heater hinged right with Floor sweep, door closer, locking latch 2 hinges, magnetic gasket and complete with hardware. Door #9 Prefabricated one North Star(Or equal) flush walk in freezer door with a wall frame & window panel. Door & frame size 116"x52". 26-gauge stucco embossed galvanized metal interior & exterior of door. (4") inches urethane foamed in place insulation. Freezer Door hinged right , with Floor sweep gasket 3 side heater, magnetic gasket, and complete with hardware. Install new 6" cover base interior & exterior, front of interface walk in door only install new Ceiling cap for front top of freezer & New threshold plate. Warranty: -All workmanship and materials must be guaranteed for one year after completion of project. Submittals: -Awarded Bidder must provide specification of proposed doors before ordering and/or installation. Labor/Scope of Work: -Remove and dispose door and frame heater at walk in freezer # 5. -Provide and install new door, "L" frame and heater element. -Install (3) sided heater element, magnetic gasket and door seals and hardware. -New door to be prefabricated to fit existing freezer opening, with vision panel. -New door approx., 36" x 78", made of 26 ga stainless steel with 3 1/2 " Urethane foamed. -Install new door / floor sweep, door closer, magnetic gaskets, locking latch and (2) hinges. -Cover and protect work area at all times during door replacement. -Clean and haul away all work-related debris upon completion. -All work will be coordinated and performed at regular business hours. -Remove and dispose Door #9 with door frame and damaged wall panel. -Support the walk in cooler ceiling pane while replacing the door and related parts. -Provide and install new door, door "L" frame, and the damaged wall panel removed. -Install (3) sided heater element, magnetic gasket and door seals and hardware. -New door to be prefabricated to fit existing freezer opening, with vision panel. -New door approx., overall size including wall panel, 166" x 52" , made of 26 ga stainless steel, embossed in galvanized metal with 4" Urethane foamed. -Install ceiling cap for the front top of freezer and new threshold -Cover and protect work area at all times during door replacement. -Clean and haul away all work-related debris upon completion. -All work will be coordinated and performed at regular business hours.

Bid Results

Municipal

$39,860.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
683
Active Projects
305
Bidding Soon
4,324
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 25, 2025

December 25, 2025

Project location map

16350 Filbert St, Los Angeles, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed