Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 26, 2025 at 7:00 PM
Updated November 27, 2025
Site work and new construction of a mixed-use development in Boston, Massachusetts. Completed plans call for the construction of a parking garage; for site work for a parking garage; transportation facility; and transportation facility.
Existing Conditions The project site currently houses the Massports Logan Express Braintree bus terminal, along with associated parking and access roads. The service provides direct connections from Braintree and South Shore communities to Boston Logan International Airport. Proposed Development Massport proposes a comprehensive redevelopment featuring the following amenities Phase 1- East Parking Garage = 1,098,500 sf with 7 levels of precast concrete parking with a precast concrete roof (the precast future proofs for the possible use for EVTOL) Phase 2- West Parking Garage = 905,600 sf with 7 levels of precast concrete parking with a precast concrete roof (the precast future proofs for the possible use for EVTOL) Terminal Building = 26,000 sf not including core and bridges see below separate calculations Core = 16,800 sf @ 7 levels and connects the East and West Parking Garages and is outside of the terminal building (assume core is built during Phase 1 Bridges occur on 6 levels = 3,600 SF @ 600 SF per level. (assume built during Phase 2 & no bridge @ level 1=ground level) The Authority seeks to construct a complex garage in the general vicinity of the existing terminal site to increase parking capacity. Along with the reconfiguration of the site, it is anticipated that a new terminal facility will be built along with two future precast parking garages. Key elements of the project are to address parking demand and customer service interest, which includes the potential for the remote terminal to have capabilities for reserved vehicle parking and advance TSA check-in and screening prior to a customer's arrival at Logan Airport. In recognition of the unique nature of the project and the services required to support it, the Authority has scheduled a Construction Manager Briefing via Microsoft Teams to be held on, Thursday, November 20th, 2025 @12:30pm. Attendees must register for the webinar by using the following link: (https://events.teams.microsoft.com/event/3915ec46-a989-47d7-99a0-ca6b6babcac3@9eb9f7c2-9da5-4db8-aebc-3b74b4fadcbb )At this session, an overview of the project will be provided, the services requested by the Authority will be described, and questions will be answered. All questions relative to your submission shall be directed to CPBidQuestions@massport.com.
GC Bidding
Parking Garage
$400,000,000.00
Public - State/Provincial
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 8, 2026
August 3, 2026
ONE HARBORSIDE DRIVE EAST, Boston, MA
Related To This Project
Boston, MA
Bid Date: Nov 12 2025
Boston, MA
Bid Date: Dec 12 2025
Boston, MA
Bid Date: Nov 26 2025
Boston, MA
Bid Date: Dec 17 2025
Boston, MA
Bid Date: Oct 26 2021
Boston, MA
Bid Date: Nov 26 2025
Boston, MA
Bid Date: Dec 01 2025
Boston, MA
Bid Date: Jan 08 2026
Boston, MA
Bid Date: Dec 04 2025
Boston, MA
Bid Date: Dec 04 2025
Boston, MA
Bid Date: Dec 02 2025
Boston, MA
--
Boston, MA
--
Boston, MA
Bid Date: Nov 25 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
