BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 9, 2025 at 7:00 PM

Updated December 10, 2025

Demolition and site work for a municipal facility in Saint Paul, Minnesota. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

Demolition work shall consist of complete removal of the structures(s), the basement walls, basement floor, and associated footings and shall include the removal of stairs, stoops, concrete slabs, clothes poles, and all other debris on the property. (*Additional items: All gas piping, water piping, sewer pipes, electrical wires, telephone wires, telegraph conduit, television cables, etc. must be properly terminated, plugged, sealed, and capped in accordance with the specific instructions of each responsible utility company. The Contractor shall pay all costs incurred in the disconnection of these utilities and services. All demolition debris and residue shall be removed from the site and disposed of properly in accordance with all federal, state, county, and city laws, ordinances, codes, and statutes. 32% Minority total project hours 20% Female total project hours Per Addendum 2 that was released last November 4, the new Q&A deadline was on November 7, 2025, 3:00pm CST.

Bid Results

Municipal

$89,000.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
125
Bidding Soon
1,538
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2025

December 19, 2025

Project location map

499 Snelling Ave, Saint Paul, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.