Published January 23, 2026 at 7:00 PM

Updated January 24, 2026

Demolition, site work, new construction and addition to a municipal facility in Saint Paul, Minnesota. Completed plans call for the demolition of a municipal facility; for the construction of a municipal facility; for the addition of a municipal facility; and for site work for a municipal facility.

The project consists of the renovation of a portion of the existing first floor tenant space of the Department of Revenue in the Stassen building on the Capitol Complex. The work will be completed under one prime contract that includes general, mechanical, demolition, and electrical construction. The scope includes selective demolition as required for new work, minor new construction of architectural walls, repair or replacement of existing ceiling grid and tiles, replacement or addition of ceiling acoustic insulation, new door installation, minor modification of existing plumbing (including new fixtures), modification or new construction of electrical systems (including connecting demountable walls and furniture, low-voltage pathways, and rough-ins), modification or new construction of mechanical systems (including thermostat relocation, VAV boxes and controls), modification of lighting systems and integration of lighting controls, modification or new construction of fire suppression systems and fire alarm system, and preparation and coordination with work scopes outside of this contract that are provided by the Owner (including demountable partitions, casework, furniture, and AV technology). Additional work includes painting and flooring. Specifically excluded scopes of work are casework, demountable partitions, furniture, security controls, low-voltage/data cabling, and audio visual equipment, which will all be provided by the Owner or their vendors. Plans and specifications are by MSR Design. Est. Completion Date: July 31, 2026 Question Deadline 11/26/2025 CT The State is not obligated to answer questions submitted after the question due date and time. Soliciting Agent: Staci Stoerzinger | Acquisition Management Specialist, 50 Sherburne Avenue, Suite 112, Saint Paul, MN 55155. (651) 201-2451 staci.stoerzinger@state.mn.us The work will be done under one prime contract that includes: General, Mechanical, Demolition, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. The total project includes the renovation of part of the existing 1st floor tenant space of the Department of Revenue in the Stassen building on the Capitol Complex. A. Selective Demolition as required for new work B. Minor new construction of architectural walls C. Repair/Replacement of existing ceiling grid and tiles and replacement/additional ceiling acoustic insulation D. New door E. Minor modification of existing plumbing, including new fixtures, in coordination with casework supplied through other Owner vendor. F. Modification/New construction of Electrical systems, including connecting demountable walls and furniture; Low-voltage pathways and rough-ins. G. Modification/New construction of Mechanical systems, including thermostat relocation, VAV boxes and controls. H. Modification of Lighting systems, lighting controls integration. I. Modification/New construction of fire suppression systems, controls and Fire alarm system. J. Preparation and Coordination with other work scopes outside of this contract provided by the Owner, including demountable partitions, casework, furniture and AV technology. K. Paint and Flooring C. The following summary is a general guide to specifically excluded scopes of work. The project will coordinate with these scopes of work. A. Casework - Provided by Owner's Vendor B. Demountable Partitions - Provided by Owner's Vendor C. Furniture - Provided by Owner's Vendor D. Security Controls - Provided by Owner E. Low-Voltage / Data Cabling - Provided by Owner F. Audio Visual Equipment - Provided by Owner's Vendor Pre-bid desp-All respondents and attendees must provide a valid government-issued photo ID to participate in the pre-bid meeting. Parking is available at State of Minnesota Capitol complex parking lots.

Award

Municipal

$1,157,384.00

Public - State/Provincial

Addition, Demolition, New Construction, Site Work

41

20

8

7

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
304
Active Projects
187
Bidding Soon
1,587
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2025

February 6, 2026

Project location map

600 Robert St N, Saint Paul, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.