BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 13, 2026 at 7:00 PM

Updated February 14, 2026

Site work, paving and new construction of a mixed-use development in Aurora, Colorado. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Reference Number 0000404296 A new pedestrian bridge at 8th Avenue will provide neighborhood residents with safe and direct access to the Canal, replacing the current well-worn social path through the canal bed. In addition, a series of wayfinding and interpretive signs will be installed to guide users and share educational information, increasing community awareness of the trail while implementing a portion of the Canal-wide signage plan. The project includes, but is not limited to the supply and installation of the following: o Surveying o Earthwork o Site Preparation o Erosion & Sedimentation Control, Slope Stabilization o Earthwork o Soil Riprap o Concrete Abutments and Walls o Pre-Fabricated Metal Bridge o Steel Pedestrian Railing o Concrete Trail o Concrete Sidewalk o Concrete Curb Ramp with Detectable Warnings o Sign Posts and Sign Panels o Final Grading o Native Seeding o Temporary Watering Question Deadline 12/02/2025 at 3:00 PM MT Questions are submitted online No, Bidders may make written inquiries concerning this ITB to obtain clarification of requirements. Written inquiries shall be emailed to: Cyndi Winner, Procurement Agent, at cwinner@auroragov.org Inquires received after the date and time indicated in the Schedule of Activities may not receive a written response. Response to written inquires (if required) will be published as an Addendum on online. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % The Contract Documents require that all work be completed within 180 Consecutive Calendar Days plus 10 Consecutive Calendar Days for Mobilization after issuance of the Notice to Proceed. Failure to complete the work as prescribed shall be considered as a Breach of Contract and subject to Liquidated Damages which are $250.00 per day. The estimated cost for this project ranges from $240,350.00 to $265,650.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The City of Aurora reserves the right to reject any and all Bids, to waive informalities and irregularities, and to accept that bid which is considered to be in the best interest of the City

Award

Bridges / Tunnels

$199,979.00

Public - City

New Construction, Paving, Site Work

18

13

3

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
9
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2026

February 4, 2026

Project location map

E 8th Ave, Aurora, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.