BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 12, 2025 at 7:00 PM

Updated December 13, 2025

Site work, paving and outdoor lighting for a mixed-use development in Burlington, Ontario. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Corporation of the City of Burlington (the City or the Owner) is endeavoring upon an annual, Pre-Qualification (RFPQ) process for qualified and experienced Contractors for various civil reconstruction projects Tendered through the City's Engineering Services Department. Projects utilizing this RFPQ will involve some or all of the following scopes of work; installation of new watermain, storm sewer and sanitary sewer repairs or installation, concrete works (Curbs and sidewalks), asphalt resurfacing, traffic signal improvements, and streetlighting improvements. Contractors who previously prequalified under RFPQ-24-504 for 2025 projects, and have not been removed from the prequalified list, do NOT need to respond to this new RFPQ. Those Contractors will receive an email directly from the City outlining the requirements for renewal and inclusion on the 2026 projects list. Contractors who did NOT prequalify under RFPQ-24-504 for 2025 projects now have the opportunity to join the prequalified list for the 2026 Projects identified within this document by responding to this new RFPQ-25-503 process. It is anticipated that the subsequent Request for Tenders will be issued for each contract between January and June 2026. Once Pre-Qualified, the Respondent will remain Pre-Qualified for the period ending December 31, 2026. Proposed Reconstruction Projects for 2026: - Spruce Avenue and Goodram Drive Area Renewal: Construction Cost Estimate: $3,300,000 - Blair Road and Landmark Road Minor Reconstruction: Construction Cost Estimate: $2,800,000 - Snake Road Minor Reconstruction: Construction Cost Estimate: $4,300,000 - Upper Middle Road Renewal (Guelph Line to 407 Crossing): Construction Cost Estimate: $6,000,000 - Walkers Line Renewal - North Service to Dundas Street: Construction Cost Estimate: $ 13,500,000 - Plains Road West Renewal - Shadeland to Waterdown Road: Construction Cost Estimate: $6,500,000 Documents can be obtained from https://burlington.bidsandtenders.ca/

Post-Bid

Roads / Highways

$36,400,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
487
Active Projects
209
Bidding Soon
4,803
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2025

February 9, 2026

Project location map

Multiple Locations, Burlington, ON


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.