BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 24, 2026 at 8:00 PM

Updated March 25, 2026

Demolition, site work and paving for a bridge / tunnel in Burlington, Ontario. Design plans call for the demolition of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Replacement of a pedestrian bridge at Ireland Park; rehabilitation of pedestrian bridges at the following locations: Centennial Recreation Trail; City View Park; Crosstown Trail; Duncaster Park; Pineland Park; Sharpe Rd/Ferguson Dr; Sherwood Forest Park; Cavendish Park; Dundas St/Appleby Line; Emerald Crescent; Optimist Park; and Taywood Park. TIMELINE: Request for Proposal for consultants for design has been awarded. Project is in preliminary design. Tender and construction timelines may be confirmed fall 2026.

Design

Bridges / Tunnels

$1,800,000.00

Public - City

Demolition, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
6
Bidding Soon
2,898
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 5, 2026

Project location map

Multiple Locations, Burlington, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.