BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2025 at 7:00 PM

Updated November 27, 2025

Site work and new construction of a water / sewer project in Starkville, Mississippi. Completed plans call for site work for a one-story above grade water / sewer project; one-story above grade water / sewer project; and one-story above grade water / sewer project.

Work consists of construction of a new headworks facility, secondary clarifier improvements, and return sludge pump station improvements. The maximum time allowable for completion is five hundred and forty (540) calendar days following the written order to commence. The successful bidder will be required to furnish a 100% payment and performance bond if the bid equals or exceeds $25,000. Proposals must be accompanied by a guaranty consisting of a bid bond, cashier's check, or certified check in the amount of 5% of the amount of the bid. All persons having a contract must adhere to policy concerning non-discrimination. For bids equal to or exceeding fifty thousand dollars, a Certificate of Responsibility Number must be written on the outside of the envelope containing the bids. If the bid is less than $50,000, mark on the outside that the bid does not exceed $50,000. For electronic submittals, the same information must be included as an attachment. Bids for work outside of the classification listed for any bidder shall be returned unopened. Preference must be given to materials grown, produced, prepared, made, or manufactured within Mississippi, unless others of equal or better quality at less or reasonable cost are available elsewhere. No materials grown, produced, prepared, made, or manufactured outside the United States may be used unless not available domestically. Preference is given to resident contractors; nonresident bidders must include with their bid a copy of their resident state's current law on treatment of nonresident contractors. Proof of actual insurance coverage must be submitted within five business days from bid acceptance. Question Deadline 12/11/2025 at 5:00 PM CT Bidders should direct questions to Matt Tabor, PE at MLTabor@GarverUSA.com The Owner intends to award this project as soon as possible and issue the Notice of Award letter to the awarded Contractor for this project no later than January 15, 2026. The Notice to Proceed will be issued at a later date. Work of the Project generally includes the construction of a new headworks facility, demolition of existing headworks facility, secondary clarifier improvements, and return sludge pump station improvements. More specifically, the Work includes, but is NOT limited to, construction of: 1. Headworks a. Construction of a new headworks facility b. Installation of pre-purchased equipment systems c. Connection of new headworks facility to existing influent pump station and oxidation ditches d. Demolition of existing headworks e. Relocation of autosampler from existing headworks to proposed 2. Secondary Clarifiers No. 1 and 2 a. Demolition of existing clarifier mechanisms b. Demolition of existing scum troughs, connection hardware, and appurtenances c. Demolition of existing bridge and railing d. Demolition of existing scum baffle, weirs, and support brackets e. Installation of new clarifier mechanism f. Installation of new walkway and railing g. Installation of new scum baffle and weir 3. RAS Pump Station No. 1 a. Removal of existing submersible pumps b. Demolition of existing pump pads and fittings c. Installation of new submersible pumps, piping and appurtenances d. Replacement of existing isolation valve identified on the drawings. 4. Secondary Clarifier 3 a. Demolition of existing clarifier mechanisms b. Demolition of existing scum troughs, connection hardware, and associated appurtenances c. Demolition of existing bridge and railing d. Demolition of existing scum baffle, weirs, and support brackets e. Installation of new clarifier mechanism 5. RAS Pump Station No. 2 a. Removal of existing submersible pumps b. Demolition of existing pump pads and fittings c. Installation of new submersible pumps and appurtenances d. Installation of new canopy 6. Site improvements to support the facilities above including yard piping, paving, grading. 7. Site electrical improvements to support the facilities above including duct banks

GC Bidding

Water / Sewer

$4,000,000.00

Public - City

New Construction, Site Work

135

28

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
55
Bidding Soon
412
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

February 16, 2026

Project location map

305 Sand Rd, Starkville, MS

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.