Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 24, 2026 at 8:00 PM
Updated March 25, 2026
Renovation of a museum in Henrico, Virginia. Completed plans call for the renovation of a museum.
The purpose of this Request for Qualifications is to obtain from interested contractors ("Applicants") their applications for prequalification ("Qualification Statements") so that the County may establish a list of contractors prequalified to submit sealed bids for the Varina on the James - Phase I project (the "Project"). In 2023 and 2024, the County of Henrico, Virginia (the "County") Board of Supervisors voted and approved the acquisition of Varina Farms, a 2,095-acre former plantation along the James River to be preserved for its historical significance, natural beauty and sensitive environment. Varina Farms is also known as Varina Plantation and Varina on the James and includes a two-story, Classical Revival-style home built in 1853 that includes cosmetic damage attributed to cannonball fire and other fighting during the Civil War. Varina Farms is listed on the National Register of Historic Places and the Virginia Landmarks Register. The Project focuses on exterior repairs and stabilization of the home/building. Scope includes brick masonry work such as repairing, repointing, and cleaning of existing surfaces. Select areas of damaged wood rafter framing and other structural framing will be replaced. Deteriorated wood lintels and sills will be replaced and refinished, along with refinishing of wood trim and sills at historic windows. Existing wood windows, doors, and exterior trim will be repaired and refinished to preserve their historic character. Copper gutters and downspouts will be removed and replaced, and modifications will be made to the roof framing, followed by roof replacement in selected areas. Interior work during Phase I will primarily consist of demolition, with some targeted wood framing repairs. Additional tasks include demolition of the existing porch, termite soil treatment, and replacement of the existing concrete vault cap. Phase I represents the initial portion of a multi-phase project, with a future phase planned to complete the interior renovation. The anticipated start date for construction is Spring/Summer 2026. The estimated construction value for this project is between $1,250,000 and $1,750,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Museum
$1,750,000.00
Public - County
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 17, 2026
May 18, 2026
To be determined, Henrico, VA
Related To This Project
Henrico, VA
--
Henrico, VA
--
Henrico, VA
--
Henrico, VA
--
Henrico, VA
Bid Date: Dec 17 2025
Henrico, VA
Bid Date: Nov 12 2025
Henrico, VA
Bid Date: Nov 26 2025
Henrico, VA
Bid Date: Oct 07 2025
Henrico, VA
Bid Date: Sep 30 2025
Henrico, VA
Bid Date: Mar 25 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
