BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 13, 2026 at 7:00 PM

Updated January 14, 2026

Site work for a water / sewer project in New York, New York. Completed plans call for site work for a water / sewer project.

The New York Power Authority (Hereafter, the "Authority" or "Nypa") Invites You to Submit a Proposal to Furnish All Supervision, Labor, Materials and Equipment (Except for Services, Materials and/or Equipment to Be Furnished by Others as Specifically Referred to in the Contract Documents) and Perform All Operations Required for the New York Power Authority's Gowanus Bulkhead Restoration. Companies/Contractors obtaining bid documents from sources other than NYPA Ariba do so at their own risk. Incomplete responses may be rejected by the Authority. MBE: 15% WBE: 15% SDVOB: 6% Gowanus Plant is one of the NYPA's Small Clean Power Plants, located at 23rd Street and 3rd Avenue adjacent to Gowanus Bay in Brooklyn, New York. The plant, built in 2002, had a bulkhead on its northwest side. The western portion (Segment I) was replaced during construction, while the eastern portion (Segments II and III) was repaired in 2003. In 2010, Segment II began tilting and was replaced in 2013. By 2018, the pavement behind the joint between Segments I and II was settling due to a failing expansion joint, and a two-foot sinkhole appeared behind the joint between Segments II and III. Additionally, pavement around the stack and washdown trough had settled, causing gaps and shifted rubber seals. Cracks were also observed in the perimeter wall. The Gowanus Bulkhead is in urgent need of significant repair due to severe section loss along its entire length, primarily caused by corrosion from tidal action, waves, and water salinity. This corrosion has led to the formation of a 4.5-foot deep by 4.2-foot diameter sinkhole at the junction between a previously replaced bulkhead and the current bulkhead. The deteriorated condition of the bulkhead threatens the continued use of the power plant's existing road and structures. To address this issue, it is proposed to install a new sheet pile bulkhead supported by an interior wale, tie-rods, and a deadman system. The existing bulkhead supports a utility road critical for the power plant's operations; continued erosion would render the road inaccessible for vehicle use. Additionally, the nearest cooling tower is being monitored for sinkage, which could halt plant operations if erosion persists. The Site currently has an existing three-foot diameter storm sewer outfall pipe. The outfall pipe will be extended to the new sheet pile wall and terminate at the seaward face of the new bulkhead. The proposed improvements aim to fortify the bulkhead and prevent further upland erosion, ensuring the stability and continued operation of the power plant.

Post-Bid

Water / Sewer

$7,000,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,168
Active Projects
537
Bidding Soon
6,593
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

February 16, 2026

Project location map

23rd St & 3rd Ave, New York, NY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.